Structural collapse
Walls, frames, floors, ceilings, shafts, platforms or temporary works that give way or move unexpectedly during construction, demolition or alteration.
هذه الصفحة باللغة الإنجليزية حاليًا.
حديث سلامة مجاني عن structural collapse
يُعرف أيضًا باسم: Structural collapse, Structure collapse, Unstable conditions/ structure, Wall collapse, Frame collapse, Ceiling collapse, Shaft collapse, Work platform collapse
كيف تتحكم في structural collapse
- Have an engineer assess the structure and the work sequence before demolition or alteration, and follow their written method.
- Design and install temporary works, such as props, bracing, shoring and formwork, to the engineer's plan and have them checked before anyone works near them.
- Do not remove, move or alter props, braces or load-bearing elements without engineering approval, and tag temporary works so tampering is obvious.
- Set exclusion zones around structures at risk of collapse, and keep people and plant out of the fall zone.
- Inspect structures and temporary works at the start of each shift and after wind, rain, impact or vibration, and stop work if anything has moved or cracked.
- Limit loads on floors, roofs and platforms to their rated capacity, and keep stored materials and plant away from unsupported edges and walls.
إجراءات التحكم المعتادة، من الأكثر فعالية إلى الأقل. بيان SWMS الخاص بك يحدد إجراءات التحكم لمهمتك وموقعك.
النماذج التي تغطي Structural collapse





















حزمة توفير · 6 نماذج


+2
حزمة توفير · 15 نماذج


+11
نظام · 111 مستندات
+107بيانات SWMS حسب المهنة
مخاطر تظهر معه عادةً
التشريعات التي تستشهد بها هذه النماذج
- WHS Act 201138 نموذج
- WHS Regulations 201138 نموذج
- Code of Practice: Construction work34 نموذج
- Code of Practice: First aid in the workplace34 نموذج
- Code of Practice: Managing the risk of falls at workplaces34 نموذج
- OHS Act 2004 (Vic)34 نموذج
- OHS Regulations 2017 (Vic)34 نموذج
- Code of Practice: How to manage WHS risks32 نموذج