
متطلبات SWMS في Western Australia
هذه الصفحة باللغة الإنجليزية حاليًا.
في Western Australia، يجب إعداد SWMS قبل بدء أي أعمال بناء عالية الخطورة. تتبع Western Australia قوانين WHS النموذجية، وواجبات SWMS فيها موجودة في Work Health and Safety (General) Regulations 2022 (WA): Regulations 299 to 303 (prepare, follow, give the principal contractor a copy, review, keep) and 312 (principal contractor obtains it).
نراجع هذه القوانين كل أسبوع. آخر مراجعة مقابل الموقع الرسمي لتشريعات كل منها في 12 November 2026.
نظرة سريعة
- القانون
- Work Health and Safety Act 2020 (WA)
- اللائحة
- Work Health and Safety (General) Regulations 2022 (WA)
- الجهة الرقابية
- WorkSafe WA
- واجبات SWMS
- Regulations 299 to 303 (prepare, follow, give the principal contractor a copy, review, keep) and 312 (principal contractor obtains it)
- أعمال البناء عالية الخطورة
- Regulation 291: the model's 18 kinds
- مشروع البناء
- 5 or more people working, or likely to be working, on the site at the same time (a headcount, not a value)
ما يشترطه القانون
- جهّز SWMS قبل بدء أعمال البناء عالية الخطورة (البند 299).
- يجب أن يحدد الأعمال عالية الخطورة، والمخاطر وأضرارها، وإجراءات التحكم، وكيف ستُطبَّق وتُراقَب وتُراجَع، بطريقة يفهمها العمال الذين يستخدمونه (البند 299).
- تأكد من تنفيذ العمل كما يقول SWMS، وأوقفه إن لم يكن كذلك، فور أن يكون الإيقاف آمنًا (البند 300).
- في مشروع البناء، أعطِ المقاول الرئيسي نسخة قبل بدء العمل (البند 301). ويجب على المقاول الرئيسي اتخاذ خطوات معقولة للحصول عليها (البند 312).
- راجِع SWMS، وعدّله حسب الحاجة، كلما تغيّرت إجراءات التحكم فيه (البند 302).
- احتفظ بنسخة حتى ينتهي العمل، ولمدة سنتين على الأقل بعد أي حادث واجب الإبلاغ مرتبط به (البند 303).
هذه هي الواجبات في لوائح WHS النموذجية. وتستخدم Work Health and Safety (General) Regulations 2022 (WA) الأرقام نفسها.
أين تختلف Western Australia عن النموذج
قواعدها الخاصة بـ SWMS وأعمال البناء عالية الخطورة مطابقة للوائح WHS النموذجية.
أعمال البناء عالية الخطورة في Western Australia
تُعد أعمال البناء عالية الخطورة، وتحتاج إلى SWMS، إذا كانت أيًّا مما يلي:
- Risk of a fall of more than 2 metresRoof work, scaffolding, edges of slabs, ladders and EWPs above 2 m.SWMS Working at Height · SWMS Roofing · SWMS Scaffolding
- Work on a telecommunication towerInstalling or maintaining antennas and equipment on a tower.SWMS Working at Height
- Demolishing structural elementsRemoving load-bearing walls, columns, beams or slabs, or anything else that keeps the structure sound.SWMS Demolition
- Disturbing asbestosDrilling, cutting or removing material that contains asbestos.SWMS Asbestos
- Structural alterations needing temporary supportPropping a structure while a wall, beam or footing is altered.SWMS Carpentry · SWMS Steel Construction · SWMS Concreting
- In or near a confined spaceWork in or near tanks, pits, sewers or silos, where the air could be unsafe or material could engulf you.SWMS Plumbing · SWMS Civil Works
- In or near a shaft or trench deeper than 1.5 metres, or a tunnelTrenches for services, footings or pits over 1.5 m, and tunnels.SWMS Civil Works · SWMS Earthmoving & Mobile Plant · SWMS Plumbing
- Use of explosivesBlasting rock or demolishing with explosives.SWMS Civil Works · SWMS Demolition
- On or near pressurised gas mains or pipingExcavating or connecting near gas mains and pipework.SWMS Plumbing · SWMS Civil Works
- On or near chemical, fuel or refrigerant linesPlant rooms, fuel lines and refrigeration or air conditioning lines.SWMS Electrical - HVAC - Solar · SWMS Plumbing
- On or near energised electrical installations or servicesWork near live switchboards, cables or overhead power lines.SWMS Electrical - HVAC - Solar
- Contaminated or flammable atmosphereAreas with fumes, solvents, fuel vapour or contaminated soil.SWMS Painting · SWMS Flooring
- Tilt-up or precast concreteLifting, propping and fixing tilt-up or precast panels.SWMS Concreting · SWMS Crane & Lifting Equipment
- On or next to a road, railway or other traffic corridor in useRoadworks, footpath work beside traffic, rail corridors.SWMS Civil Works · SWMS Transport & Warehousing
- Where powered mobile plant is movingSites with excavators, forklifts, rollers or trucks moving.SWMS Earthmoving & Mobile Plant · SWMS Civil Works
- Artificial extremes of temperatureCold rooms, freezers, furnaces and other artificially hot or cold areas.SWMS Electrical - HVAC - Solar · SWMS Shop Fitting
- In or near water or liquid with a risk of drowningPools, waterways, wharves, flooded excavations and tanks.SWMS Swimming Pool · SWMS Civil Works
- Diving workConstruction diving, such as underwater inspection or repairs.SWMS Civil Works
افحص عملك
حدّد كل ما يشمله العمل. تظهر الإجابة فورًا.
تُرجم للتسهيل. النسخة الإنجليزية هي المرجع.
لوائح WHS النموذجية، كما اعتمدتها Western Australia. الجهة الرقابية: WorkSafe WA
حدّد الأعمال التي تشملها مهمتك لترى الإجابة.
معلومات عامة، وليست استشارة قانونيةنراجع القانون أسبوعيًا · آخر مراجعة 12 نوفمبر 2026لوائح WHS، البند 291الإبلاغ عن مشكلة
نماذج SWMS الأكثر طلبًا






أسئلة شائعة
- هل أحتاج إلى SWMS في Western Australia؟
- نعم، قبل بدء أي أعمال بناء عالية الخطورة. تتبع Western Australia قوانين WHS النموذجية، لذا فإن قائمة أعمال البناء عالية الخطورة وواجبات SWMS موجودة في Work Health and Safety (General) Regulations 2022 (WA) الخاصة بها.
- من هي الجهة الرقابية للصحة والسلامة في العمل في Western Australia؟
- WorkSafe WA.
- متى تنطبق واجبات المقاول الرئيسي في Western Australia؟
- في مشروع البناء. وفي Western Australia، يعني ذلك 5 or more people working, or likely to be working, on the site at the same time (a headcount, not a value).
متطلبات SWMS في الولايات والأقاليم الأخرى
- New South Wales
- Victoria
- Queensland
- South Australia
- Tasmania
- Northern Territory
- Australian Capital Territory
- قارن كل الولايات
هذا ملخص للتخطيط، وليس استشارة قانونية. تحقق من القانون الساري لدى الجهة الرقابية، خاصة قبل الاعتماد على تغيير حديث.