Crane and load collision 툴박스 미팅
이 페이지는 현재 영어로만 제공됩니다.
작업 전 회의(pre-start)나 툴박스 미팅에서 읽어 주고, 질문을 함께 이야기한 뒤, 모두 서명하게 하세요. 저희 crane and load collision 페이지와 이를 다루는 SafetyDocs 템플릿 73개를 바탕으로 만들었습니다.
- 현장
- 날짜
- 진행자
무엇인가요
A crane, its boom or a suspended load striking another crane, a structure or people, often where cranes share airspace.
확인할 관리 조치 (효과가 큰 순서)
- Plan crane positions and slewing paths so working radii don't overlap, or set a no-go zone for each crane where they must.
- Check for structures, scaffolds and power lines within the crane's working envelope before set-up.
- Use anti-collision systems or spotters to keep cranes, booms and loads apart where cranes share airspace.
- Agree a lift plan and a communication channel with other crane operators, doggers and spotters before lifting.
- Use tag lines to control load rotation, and keep people out from under and beside suspended loads.
- Stop lifting when visibility or wind reduces the operator's control of the load.
작업자에게 할 질문
- 오늘 이 작업에서 어디서 crane and load collision 위험이 생길 수 있나요?
- 가장 효과적인 관리 조치는 “Plan crane positions and slewing paths so working radii don't overlap, or set a no-go zone for each crane where they must”입니다. 여기서 할 수 있나요? 할 수 없다면 왜 그런가요?
- 이 현장에서 빠졌거나 제대로 작동하지 않는 crane and load collision 관리 조치는 무엇인가요?
- crane and load collision 때문에 작업을 멈춰야 하는 때는 언제이고, 누구에게 알리나요?
- 이 작업에서 위험 요소, 아차 사고, 사고는 어떻게 보고하나요?
서명 기록
참석한 모든 사람이 아래에 서명합니다. 툴박스 미팅 기록과 함께 보관하세요.
| 이름 | 회사 | 서명 |
|---|---|---|
미팅을 위한 출발점일 뿐, SWMS나 위험성 평가가 아닙니다. 현장과 작업자에 맞는 내용을 추가하세요.