작업 전 회의(pre-start)나 툴박스 미팅에서 읽어 주고, 질문을 함께 이야기한 뒤, 모두 서명하게 하세요. 저희 inadequate planning and design 페이지와 이를 다루는 SafetyDocs 템플릿 75개를 바탕으로 만들었습니다.

현장
날짜
진행자

무엇인가요

Hazards that go unrecognised or uncontrolled because the work, site conditions or design were not planned, assessed or consulted on beforehand.

확인할 관리 조치 (효과가 큰 순서)

  1. Consider safety in design before work starts, and ask designers and engineers to remove or reduce hazards at source.
  2. Plan the job in steps before starting, including access, equipment, sequence, emergency arrangements and who does what.
  3. Assess the risks for the task and site conditions, and review the assessment when conditions or the scope of work change.
  4. Consult workers, other contractors and the person in control of the site, and share the plan with everyone who is affected.
  5. Do a pre-start walk-through and update the hazards at the start of each shift, noting anything that has changed.
  6. Monitor hazards throughout the job, and stop work to reassess if something unexpected comes up.

작업 중 어디서 생기나요

inadequate planning and design 관련 SafetyDocs 템플릿의 작업 단계:

작업자에게 할 질문

  1. 오늘 이 작업에서 어디서 inadequate planning and design 위험이 생길 수 있나요?
  2. 가장 효과적인 관리 조치는 “Consider safety in design before work starts, and ask designers and engineers to remove or reduce hazards at source”입니다. 여기서 할 수 있나요? 할 수 없다면 왜 그런가요?
  3. 이 현장에서 빠졌거나 제대로 작동하지 않는 inadequate planning and design 관리 조치는 무엇인가요?
  4. inadequate planning and design 때문에 작업을 멈춰야 하는 때는 언제이고, 누구에게 알리나요?
  5. 이 작업에서 위험 요소, 아차 사고, 사고는 어떻게 보고하나요?