작업 전 회의(pre-start)나 툴박스 미팅에서 읽어 주고, 질문을 함께 이야기한 뒤, 모두 서명하게 하세요. 저희 rail corridor hazards 페이지와 이를 다루는 SafetyDocs 템플릿 16개를 바탕으로 만들었습니다.
- 현장
- 날짜
- 진행자
무엇인가요
Working in or next to a railway, where trains, rail traffic and overhead wiring can strike or electrocute workers.
확인할 관리 조치 (효과가 큰 순서)
- Plan work to keep out of the rail corridor, and do it from outside the danger zone wherever possible.
- Get the rail operator's permission and track access, and follow their safe working rules and protection arrangements.
- Have workers hold the rail safety induction and competencies the rail operator requires.
- Use a protection officer or lookout to warn of approaching trains, and agree a place of safety and warning signals before starting.
- Keep tools, plant and long items clear of the rail corridor and overhead wiring, and treat all overhead wires as live.
- Stop work and clear the corridor at once when a warning is given, and do not return until the all clear is given.
작업자에게 할 질문
- 오늘 이 작업에서 어디서 rail corridor hazards 위험이 생길 수 있나요?
- 가장 효과적인 관리 조치는 “Plan work to keep out of the rail corridor, and do it from outside the danger zone wherever possible”입니다. 여기서 할 수 있나요? 할 수 없다면 왜 그런가요?
- 이 현장에서 빠졌거나 제대로 작동하지 않는 rail corridor hazards 관리 조치는 무엇인가요?
- rail corridor hazards 때문에 작업을 멈춰야 하는 때는 언제이고, 누구에게 알리나요?
- 이 작업에서 위험 요소, 아차 사고, 사고는 어떻게 보고하나요?
서명 기록
참석한 모든 사람이 아래에 서명합니다. 툴박스 미팅 기록과 함께 보관하세요.
| 이름 | 회사 | 서명 |
|---|---|---|
미팅을 위한 출발점일 뿐, SWMS나 위험성 평가가 아닙니다. 현장과 작업자에 맞는 내용을 추가하세요.