Structural collapse

Walls, frames, floors, ceilings, shafts, platforms or temporary works that give way or move unexpectedly during construction, demolition or alteration.

이 페이지는 현재 영어로만 제공됩니다.

structural collapse 무료 툴박스 미팅 자료

다른 이름: Structural collapse, Structure collapse, Unstable conditions/ structure, Wall collapse, Frame collapse, Ceiling collapse, Shaft collapse, Work platform collapse

structural collapse 관리 방법

  1. Have an engineer assess the structure and the work sequence before demolition or alteration, and follow their written method.
  2. Design and install temporary works, such as props, bracing, shoring and formwork, to the engineer's plan and have them checked before anyone works near them.
  3. Do not remove, move or alter props, braces or load-bearing elements without engineering approval, and tag temporary works so tampering is obvious.
  4. Set exclusion zones around structures at risk of collapse, and keep people and plant out of the fall zone.
  5. Inspect structures and temporary works at the start of each shift and after wind, rain, impact or vibration, and stop work if anything has moved or cracked.
  6. Limit loads on floors, roofs and platforms to their rated capacity, and keep stored materials and plant away from unsupported edges and walls.