Skip to content

Early access offer: 30% off, for as long as you stay subscribed.

Claim offer

Free risk assessment template

Pick a risk assessment form from the library, open it in the editor with no sign-up, and add your site, the hazards, their ratings and the controls. Sign up free to save it, share it by QR code or link, and have your crew sign on their phones. A library template is $89.95 to keep, once.

What a risk assessment is

How to do a risk assessment

Risk assessment templates to start from

What you get free

  • The editor, to fill in and tailor any library template before you sign up
  • Printable toolbox talks on common hazards
  • The 5×5 risk matrix calculator
  • Share by QR code, link or site tablet
  • See who's signed
  • Join other companies' jobs and sign
  • 20 AI credits a month, to convert files and translate

Common questions

Is the risk assessment template really free?
Trying it is: open any risk assessment form in the editor and fill it in with no sign-up. A free account lets you save it, share it and get it signed. A library template costs $89.95 to keep, once, and the risk matrix calculator is free.
Is a risk assessment a legal requirement in Australia?
You must manage risks: eliminate them so far as is reasonably practicable, or minimise them if you can't (section 17 of the WHS Act). A risk assessment is mandatory for some high-risk work, such as confined spaces, diving and live electrical work. For other work, the Code of Practice says to assess a risk when you're unsure how a hazard could cause harm, when hazards could interact, or when a change at the workplace could affect the controls.Sources: WHS Act, section 17 · Code of Practice: How to manage WHS risks
How do I rate a risk?
Combine how likely harm is with how bad it would be. On a 5×5 matrix each runs from 1 to 5, and the score gives a rating from low to extreme. Whatever the rating, eliminate the risk if you reasonably can.Sources: 5×5 risk matrix calculator
Is a risk assessment the same as a SWMS?
No. A SWMS is required before high-risk construction work, the 18 kinds listed in regulation 291, and must be prepared before the work starts (regulation 299). A risk assessment suits any work. Many jobs need both: a SWMS for the high-risk activity and a risk assessment for the rest.
How often should I review a risk assessment?
Review the controls when they don't control the risk, before a change at the workplace that could bring a new risk, when a new hazard turns up, when consultation shows a review is needed, and when a health and safety representative asks (regulation 38). Review high risks more often than low ones.Sources: WHS Regulations, regulation 38