Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer

Thicknesser

SOP · SOP-60060

  • Version 4
  • Power Tools & Equipment
  • Reads on any phone

The Thicknesser Safe Operating Procedure (SOP) provides a structured approach to operating the equipment safely, helping to protect workers and streamline operations.

It covers the hazards (noise, electricity, moving objects, dust and debris, manual handling and poor housekeeping), the work area, PPE, operator training, a pre-operational inspection, maintenance, step-by-step operation and the steps on completion.

A hazard checklist for powered non-mobile plant helps monitor and mitigate the risks of the machine. A training quiz comes with the procedure.

Preview of the Thicknesser SOP

Thicknesser

SOPVersion 4

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

  • RCD - Residual Circuit Device.

Hazards

What can cause harm?

  • Noise

  • Electricity

  • Moving objects

  • Dust and debris

  • Manual Handling

  • Poor housekeeping

Portable thicknesser on a stand with its table extensions and handles

Work area

  • No trip or slip hazards

  • Adequate lighting

  • No flammables

PPE

  • Foot Protection
  • Eye Protection
  • Hearing Protection
  • Breathing Protection

Pre-operational inspection

Follow the pre-operational checklist in the manufacturer’s operational manual, ensure:

  • Holding screws are tight and correctly adjusted

  • Rollers are clean and free from wood chips & no resin build-up

  • Blades are in good condition, sharp, no damage (chips), secured & suitable to the material being cut

  • Blades are installed as per the manufacturer’s operation manual

  • No excess build-up of resin on blades

  • Lead is tested and tagged – (RCD should be used if required)

  • Appropriate extraction is available and operational, if required.

5 more sections, from Precautions to Hazard checklist (powered non-mobile plant)

Written in full, ready for your business's details.

Preview as

How it reads in a browser

Get this template

Sign up free, then choose how you'd like it. Your company details fill in for you.

  • Included in paid plans

    Use template credits from your plan. This one costs 1.

    Compare plans and prices
  • Buy it once

    $89.95 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

9 sections

  1. Hazards
  2. PPE
  3. Pre-operational inspection
  4. Precautions
  5. Maintenance
  6. Operation
  7. On completion
  8. Hazard checklist (powered non-mobile plant)

Plus definitions

Reviews

No reviews yet.

See all

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.