Precast Panel Information and Verification Log
Tilt-up and Precast Concrete Panel Checklist · FORM-31506
- Site address
- [Site address]
- Project Name/Description
- [Job name]
- Project manager
- —
- Project manager Mob. Ph
- —
- Project manager Email
- —
- Company Supervisor
- —
- Company Supervisor Mob. Ph
- —
- Company Supervisor Email
- —
- Certifying Engineer Company
- —
- Certifying Engineer Company ABN
- —
- Certifying Engineer Company Mob. Ph
- —
- Certifying Engineer Company Email
- —
- Certifying Engineer
- —
- Certifying Engineer Mob. Ph
- —
- Certifying Engineer Email
- —
- Panel Constructor
- —
- Panel Constructor ABN
- —
- Panel Constructor Mob. Ph
- —
- Panel Constructor Email
- —
- Panel Erector
- —
- Panel Erector ABN
- —
- Panel Erector Mob. Ph
- —
- Panel Erector Email
- —
Panel ID | Casting Date | Engineering Drawing # | Concrete Supplier | Concrete Spec | Concrete Slump | Concrete Test Result | Lifting Date | Remarks /Notes | Verifiers Name/Position | Initial/Date |
|---|---|---|---|---|---|---|---|---|---|---|
Tilt-up and precast concrete pour checklist
Concrete pour
Inspection criteria | Comments | Action required |
|---|---|---|
Concrete Sampling: | ||
Concrete Sampling: | ||
Concrete Check: | ||
Concrete Check: | ||
Concrete Check: | ||
Concrete Pour: | ||
Concrete Pour: | ||
Concrete Pour: | ||
Concrete Finish: | ||
Concrete Curing: |
Inspectors’ name | Signature | Date |
|---|---|---|
Tilt-up and precast concrete panel: pre-lift checklist
Section 1: Pre-erection checks
Inspection criteria | Comments | Action required |
|---|---|---|
Erection and Temporary Bracing: | ||
Deadman Design: | ||
Panel Layout and Erection Sequence: | ||
Concrete Panel Strength: | ||
Deadmen/Floor Slab Strength: | ||
Panel Identification: |
Section 2: Bracing and anchor requirements
Inspection criteria | Comments | Action required |
|---|---|---|
Brace Adherence and Strength: | ||
Brace Condition Suitability: | ||
Brace Identification Marking: | ||
Accurate Brace Quantity: | ||
Brace Installation: | ||
Anchor installation: | ||
Section 3: General hazards
Inspection criteria | Comments | Action required |
|---|---|---|
Section 4: First aid and emergency preparedness
Inspection criteria | Comments | Action required |
|---|---|---|
Inspectors’ name | Signature | Date |
|---|---|---|
Tilt-up and precast concrete panel: lift checklist
Section 1: Lift preparation
Inspection criteria | Comments | Action required |
|---|---|---|
Overhead Power Lines: | ||
Exclusion Zones: | ||
Exclusion Zone Height: | ||
Wind Conditions: |
Section 2: Crane operations
Inspection criteria | Comments | Action required |
|---|---|---|
Section 3: Rigging operations
Inspection criteria | Comments | Action required |
|---|---|---|
Section 4: Panel placement and alignment
Inspection criteria | Comments | Action required |
|---|---|---|
Inspectors’ name | Signature | Date |
|---|---|---|
Tilt-up and precast concrete panel: post-lift assessment checklist
Section 1: Panel integrity
Inspection criteria | Comments | Action required |
|---|---|---|
Section 2: Crane and rigging
Inspection criteria | Comments | Action required |
|---|---|---|
Section 3: Anchors and bracing
Inspection criteria | Comments | Action required |
|---|---|---|
Section 4: Panel installation
Inspection criteria | Comments | Action required |
|---|---|---|
Section 5: Safety
Inspection criteria | Comments | Action required |
|---|---|---|
Section 6: Documentation
Inspection criteria | Comments | Action required |
|---|---|---|
Inspectors’ name | Signature | Date |
|---|---|---|
Its guidance and example entries are locked
You can see how the form is laid out. Get it to fill in on any device, print it, or make it your own.
Tilt-up and Precast Concrete Panel Checklist · FORM-31506




