Founding offer: 30% off, for as long as you stay subscribed.

Claim offer

Early access · Launching late 2026

Written by experts. Tailored in minutes. Ready for any site.

Write your RAMS once and make it fit each job in minutes, with expert-written templates on the way for the UK. Get feedback from your main contractor, and have your crew read and sign it on any phone. Nothing for them to download.

  • 40,000+ customers
  • Australian industry leader since 2004
  • 400+ expert-written templates in Australia
  • Workers sign free
The Height Access Equipment RAMS (RAMS-10131) lifts out of the library, its job details fill in, the main contractor asks for an exclusion zone and the row is updated, a crew member signs on a phone, and the job reaches 100% compliance.

Trusted by

  • Uber
  • Kitchen Innovations (KI Design)
  • Wattle Range Council
  • Airmaster
  • Mid-Western Regional Council
  • Thermosash

See it in action

Less chasing. More building.

Watch a SWMS go from the library to signed by the whole crew before the gate, in just over a minute.

Why SafetyDocs

Twenty years of safety know-how, in every document.

Pop-up apps and generated documents are everywhere. SafetyDocs is built by a team that has written safety documents since 2004, so you start from something you can trust and spend your time on the job, not the paperwork.

  • Since 2004
  • 40,000+ customers
  • 400+ Australian templates across 30 trades and industries

How it works

From library to signed, in four steps.

Templates for the UK are on the way.

Key features

Templates

Expert-written RAMS, plus the SOPs, plans and policies that go with them. Coming to the UK.

  • Search by trade or task; filter by industry and type.
  • Preview any template before you use it.
  • Template credits every month on paid plans, or buy one when you need it.
  • SOPs, management plans, policies, value packs and systems too.
The Templates screen. The filter is set to Electrical, the grid shows electrical RAMS with their store photos, and Switchboard Installation has just been added, using one of this month's template credits.

Key features

Documents

Edit any RAMS like a normal document, on a computer or your phone. No Word.

  • Smart fields fill in the job, client and site.
  • Your logo on every page, set once.
  • Every change is a new version, so you know which one was signed.
  • An A4 page on a computer, one clean column on a phone.
The document editor in front of the Documents page: the Height Access Equipment RAMS on an A4 page, with the job, client and site filled in by smart fields, a control measure just retyped, and the change saved as version 1.4.

Key features

Jobs

Everything the site needs in one place: RAMS, site plans, drawings and any other document.

  • Add a document and it fills in with the job's details.
  • Each job gets its own copy. Your originals stay as they are.
  • Your crew gets in by QR code or invite.
  • Other companies on the job add their own documents, and keep them when it ends.
The job Newstead Gasworks Refurbishment, with its documents. The Height Access Equipment RAMS has just been added from Documents and filled in with the job's name, client and site. A notification shows that Rosa Delgado from Coastline Plumbing added the Plumbing Gas Fitting RAMS, and it now sits in the job's documents marked Coastline Plumbing.

Key features

Sign-on

Workers open the job from a text, an email or the QR code on the gate, and sign with a finger.

  • Nothing to download, no account to make.
  • We never charge anyone to view or sign.
  • Print the QR code for the gate, or the RAMS for a paper sign-on.
  • Each signature is tied to the version they read.
Three ways in, a text message, an email and a QR code poster on the site gate, lead to one phone, where a worker has signed the Height Access Equipment RAMS. Beside it, a printed sign-on sheet with its own QR code.

Key features

Feedback

Workers flag problems in the RAMS from their phone, and the whole job talks in one place.

  • Raise an issue on any step of a RAMS, with a photo.
  • You see it straight away, fix the document and everyone gets the update.
  • Job chat keeps site updates, photos and questions with the job.
  • Every issue, message and fix stays on the job's record.
On her phone, Bec Whitlock raises an issue on step 2 of the Height Access Equipment RAMS: No harness anchor on the level 2 edge, with a photo. In the job's Activity tab, Daniel Nguyen sees the issue, replies in the job chat that the anchors go in at 10am, and updates the RAMS. The record reads: Height Access Equipment RAMS updated to v1.4, 6 crew asked to sign again.

Key features

Contacts

Your team and subcontractors in one address book, sorted into groups.

  • Add a whole group to a job at once.
  • Import the worker list a subcontractor sends you.
  • Share or export crew details when a main contractor asks.
  • Invite by email or text from your contacts.
The Contacts table with the Groups pane. Four people imported from crew-list.csv, Coastline Plumbing's crew, are selected, and the selection bar has added them to the Newstead Gasworks Refurbishment job.

Key features

Approvals

Send a RAMS to any main contractor or principal contractor for approval, even if they don't use SafetyDocs.

  • They comment and approve from a link. No account needed.
  • Make the fix and send the update in minutes.
  • A record of who approved which version, and when.
  • You keep the master copy and its history.
Two windows. In yours, the Height Access Equipment RAMS sent for review to Priya Nair at Harbourline Construction. In hers, a plain browser window marked No account needed, she commented on the Falling objects row, the fix arrived as version 1.3, and she approved it. A record card reads: Approved by Priya Nair, Harbourline Construction, v1.3, 21 Nov 2026, 6:42am.

Key features

Credentials

Every ticket, licence and insurance for the job in one place, uploaded by the people who hold them.

  • Crew upload from their phone. No account needed.
  • Tick who needs what, and they're asked by email or text.
  • Expiry dates tracked, with a heads-up before anything runs out.
  • A SWMS can ask for a licence photo at sign-on.
The Credentials table for Newstead Gasworks Refurbishment, a row per worker and a column per credential, beside Liam Fitzgerald's phone. Harbourline Constructions has asked him for his Work safely at heights ticket. He photographs the front and back, adds the expiry date and uploads it, and his cell in the table turns from Missing to To 14 Mar 27. An alert reads: Connor Walsh's ticket expires in 6 days.

Key features

Permits

Permits to work for hot work, confined spaces and heights, filled in, approved and signed on to from the job.

  • Start from a hot work, confined space or work at height permit.
  • A bar under the permit shows each person what's left, and takes them to it.
  • Nobody signs on until it's approved.
  • Every answer is kept, with who gave it and when.
The Hot work permit PTW-0041 for Mezzanine C4–C6, waiting for approval, with a bar along its foot showing 0 of 2 for you and Next: Fire watch. Priya Nair names Sam Okafor as the fire watch and marks the gas test clear, the bar reads 2 of 2, she approves it and it turns Active. On his phone, Liam Fitzgerald answers the crew question and signs on, and the bar shows 1 signed on.

Feature summary

Built for how you actually work.

View as
The template library scrolls past: expert-written RAMS for every trade.

Expert-written templates, coming to the UK

Trade or subcontractor
Find the RAMS for your trade and get going in minutes.
Main contractor
Start every job from a document that's been done properly.
Principal contractor
A consistent, expert-written starting point for every contractor.
On a phone, the job's details fill themselves into the RAMS and the editing toolbar slides up.

Make it fit the job

Trade or subcontractor
Site details fill themselves in, and you can edit on your phone. No Word.
Main contractor
Tailor one RAMS to every site, with your logo on every page.
Principal contractor
Site-specific documents, without starting from scratch.
The same RAMS reflows from an A4 page with a risk table into hazard cards on a phone.

Easier to read, easier to understand

Trade or subcontractor
Your crew reads it properly on their phone, not a squashed Word file.
Main contractor
Documents that adapt to any screen, so they actually get read.
Principal contractor
Easier reading means better understanding and safer sites, with no extra hoops.
A crew member scans the QR code on the gate and signs on their own phone. A text, a link or the QR code all work.

No app. No account. Just sign.

Trade or subcontractor
Your crew signs from a text, a link or the QR on the gate.
Main contractor
Every subcontractor's crew signs on their own phone. Nothing to install.
Principal contractor
Unlimited workers sign free, with nothing to install.
The main contractor comments on a Bulk Excavations RAMS before the job starts. It is fixed and marked Updated, and the gate opens.

Get it right before the gate

Trade or subcontractor
Send your RAMS to the main contractor for comments, fix it in minutes, and never get turned away on site.
Main contractor
Comment on a subcontractor's RAMS in the document and get the fix back in the same place.
Principal contractor
Review contractor RAMS in one place, even when they don't use SafetyDocs.
Publish v1.3? 3 people will be asked to sign again. After publishing, their rows change to Sign again.

Change it once

Trade or subcontractor
Update a RAMS without reprinting a thing.
Main contractor
Change a document and the right people are asked to sign again.
Principal contractor
Every signature is tied to the version the worker saw.
One RAMS, Height Access Equipment, goes with its owner to every job: Newstead Gasworks, Kingsway Substation and Fitzroy Street.

Your RAMS go where you go

Trade or subcontractor
Keep your RAMS and sign-ons across every main contractor and every job.
Main contractor
Every job's documents and sign-ons on one record.
Principal contractor
Records that stay complete, even across other platforms.
One job, Newstead Gasworks, with a folder for each team's documents.

Every team, one job

Trade or subcontractor
Join a main contractor's job and keep your own documents in it.
Main contractor
Each subcontractor's documents in their own folder on the job.
Principal contractor
Job folders for large sites, with roles and an audit log.

Compare

Write it, tailor it and get it signed, in one place.

Many RAMS are still Word files that get printed or emailed. Plenty of RAMS apps help you get a file signed, but you still write and fix it somewhere else. SafetyDocs does both.

How a Word or printed RAMS, a typical RAMS sign-on app and SafetyDocs compare
A Word or printed RAMSA typical RAMS sign-on appSafetyDocs
Writing it
Where you startA blank template, or last job's fileA file you wrote somewhere else, then uploadedYour own RAMS, with expert-written templates on the way
Fitting it to the jobRetype the details in Word, on a computerFix the file somewhere else, then upload it againJob details fill themselves in. Edit on your phone
Main contractor feedbackEmails back and forthSent back with notes. Fix the file and upload it againComments in the document, fixed in the same place
Using it on site
Reading itA printed copy, or a squashed PDF on a phoneOften a PDF on a phoneOne clean column on a phone. No pinching to zoom
Other languagesEnglish only, unless you pay to have it translatedRarely offered for the RAMS itselfSend it in your crew's languages. The English original stays the record
Signing itA paper sheet, if it comes backIn a browser or an app, sometimes with an accountFrom a text, link or QR code. No app, no account
Raising a problemSaid out loud on site, with no recordRarely a way to question the RAMS itselfRaise an issue on any step, with a photo. Everyone gets the fix
Changing itReprint it, and everyone signs again by handOften a new upload. Several apps then ask workers to sign againEdit it in place. Everyone who signed is asked to sign the new version
Who keeps itSpread across emails and foldersUsually stays with the main contractor when the job endsYours, across every main contractor and every job
Getting started
Trying itBuy the templateOften a demo or a quote before you see a priceStart free, no demo needed. Every price is on this page

“A typical RAMS sign-on app” sums up the public websites and help pages of the main safety document sign-on apps used in Australia, where SafetyDocs is based, read in October 2026.

For big jobs

Running the big jobs with multiple subcontractors?

Book a demo

SafetyDocs is built for big jobs where many companies work together. Each subcontractor keeps their own documents, you see every RAMS and sign-on in one place, and nobody is forced onto another platform. Let us show you how the big jobs spend less time on paperwork and more time getting the work done.

The Jobs page in SafetyDocs: Newstead Gasworks, Kingsway Substation and Fitzroy Street, each with its compliance ring and its crew, documents and activity. New lines arrive in the activity feed from each company on the jobs, the rings change as people sign or a RAMS is updated, and Newstead Gasworks shows who has signed, company by company.

Plans

A plan for every scale of work.

Every price is on this page. Start free, with no demo or card needed, and pick the plan that fits the work you do.

Free

A$0 forever

AUD, incl. GST

NZ$0 forever

NZD, excl. GST

£0 forever

GBP, excl. VAT

€0 forever

EUR, excl. VAT

US$0 forever

USD, excl. tax

Get your RAMS signed and join a main contractor's job.

  • 1 active job, public only
  • Share by QR code, link or site tablet
  • See who's signed
  • Feedback and job chat
  • Join other companies' jobs and sign
  • 5 team members
  • 20 AI credits a month, to convert files and translate
  • 50 email shares a month
  • 7 days of audit history
  • Templates to keep: A$89.95 each, or A$499.95 for a systemTemplates to keep: NZ$109.95 each, or NZ$614.95 for a systemTemplates to keep: £44.95 each, or £259.95 for a systemTemplates to keep: €54.95 each, or €314.95 for a systemTemplates to keep: US$64.95 each, or US$349.95 for a system
Get early access

Best for trades and subcontractors

Bronze

A$89.95 / monthA$71.95 / month, billed yearly

AUD, incl. GST

NZ$109.95 / monthNZ$87.95 / month, billed yearly

NZD, excl. GST

£44.95 / month£35.95 / month, billed yearly

GBP, excl. VAT

€54.95 / month€43.95 / month, billed yearly

EUR, excl. VAT

US$64.95 / monthUS$51.95 / month, billed yearly

USD, excl. tax

Create, tailor and keep your own RAMS, so you're never turned away on site.

  • 3 active jobs
  • Invite by email and text, with reminders
  • See who hasn't signed
  • Verified signatures and your logo
  • Add your RAMS to main contractors' jobs
  • Private jobs
  • 10 team members
  • 600 AI credits a month to convert files and translate, then 1,000 for A$9.95600 AI credits a month to convert files and translate, then 1,000 for NZ$11.95600 AI credits a month to convert files and translate, then 1,000 for £4.95600 AI credits a month to convert files and translate, then 1,000 for €5.95600 AI credits a month to convert files and translate, then 1,000 for US$6.95
  • 100 texts a month, then A$0.15 each100 texts a month, then NZ$0.18 each100 texts a month, then £0.08 each100 texts a month, then €0.09 each100 texts a month, then US$0.10 each
  • Unlimited email shares
  • 1 template credit a month, then A$49.95 each, or 10 for A$449.951 template credit a month, then NZ$59.95 each, or 10 for NZ$554.951 template credit a month, then £24.95 each, or 10 for £234.951 template credit a month, then €30.95 each, or 10 for €279.951 template credit a month, then US$34.95 each, or 10 for US$314.95
  • A year of audit history
Get early access

Best for main contractors

Silver

A$199.95 / monthA$159.95 / month, billed yearly

AUD, incl. GST

NZ$244.95 / monthNZ$195.95 / month, billed yearly

NZD, excl. GST

£104.95 / month£83.95 / month, billed yearly

GBP, excl. VAT

€124.95 / month€99.95 / month, billed yearly

EUR, excl. VAT

US$139.95 / monthUS$111.95 / month, billed yearly

USD, excl. tax

Every subcontractor's RAMS collected, reviewed and signed.

Everything in Bronze, plus:

  • 10 active jobs
  • Approve RAMS before they go out
  • Scheduled invites
  • Document requests
  • 3 subcontractor passes
  • 50 team members
  • 1,500 AI credits a month, then 1,000 for A$9.951,500 AI credits a month, then 1,000 for NZ$11.951,500 AI credits a month, then 1,000 for £4.951,500 AI credits a month, then 1,000 for €5.951,500 AI credits a month, then 1,000 for US$6.95
  • 400 texts a month, then A$0.15 each400 texts a month, then NZ$0.18 each400 texts a month, then £0.08 each400 texts a month, then €0.09 each400 texts a month, then US$0.10 each
  • 2 template credits a month, then A$49.95 each2 template credits a month, then NZ$59.95 each2 template credits a month, then £24.95 each2 template credits a month, then €30.95 each2 template credits a month, then US$34.95 each
Get early access

Best for principal contractors

Gold

A$599.95 / monthA$479.95 / month, billed yearly

AUD, incl. GST

NZ$739.95 / monthNZ$591.95 / month, billed yearly

NZD, excl. GST

£314.95 / month£251.95 / month, billed yearly

GBP, excl. VAT

€374.95 / month€299.95 / month, billed yearly

EUR, excl. VAT

US$419.95 / monthUS$335.95 / month, billed yearly

USD, excl. tax

Your subcontractors covered, at your cost.

Everything in Silver, plus:

  • 25 active jobs
  • Unlimited subcontractor passes: subcontractors run their part of your job
  • Subcontractors keep their documents after the job
  • 100 team members
  • 1,000 texts a month, then A$0.15 each1,000 texts a month, then NZ$0.18 each1,000 texts a month, then £0.08 each1,000 texts a month, then €0.09 each1,000 texts a month, then US$0.10 each
  • 4,000 AI credits a month, then 1,000 for A$9.954,000 AI credits a month, then 1,000 for NZ$11.954,000 AI credits a month, then 1,000 for £4.954,000 AI credits a month, then 1,000 for €5.954,000 AI credits a month, then 1,000 for US$6.95
Get early access

Enterprise

For tier 1 and 2, mining and manufacturing: every site and every contractor, under your rules.

  • Unlimited active jobs
  • Integrations and API
  • Custom roles
  • Company-wide signing rules
  • Single sign-onComing
Book a demo

On every plan

  • Unlimited workers sign free
  • No app or account to sign
  • QR code, link or site tablet
  • Your signed records are always yours

Everyone on the job works together, whatever plan they're on.

Subcontractors never pay to join a job, read the RAMS or sign. Their documents stay theirs, from one job to the next.

On a main contractor's job
Subcontractors on any plan, Free included, join the job and sign. On Bronze they add their own RAMS for the main contractor to review.
On a principal contractor's job
On Gold, the principal contractor gives subcontractors a subcontractor pass, at its own cost. Subcontractors run their part of the job and add their own RAMS, then keep their account and documents when it ends.
A job shared by three companies on different plans. The main contractor comments on the subcontractor's RAMS, the subcontractor updates it, and the main contractor sees the change.

Founding offer

Founding members: 30% off, for as long as you stay subscribed.

Your founding price stays while your subscription continues, even if you change plan. The offer closes on 31 December 2026.

Get early access

No card needed to register.

For everyone who registers

  • The templates you've already bought from our store come with you into the app.
  • You can still buy single templates from the store.
  • Workers and subcontractors never pay to read and sign.
  • Registering doesn't need a credit card.

From our Australian store reviews

Built on documents people already trust.

Rated 4.6 out of 5 across 123 reviews on our Australian store.

  • “Being a new start up it has saved me a lot of time and headaches!”

    Bulk Excavations SWMSVerified buyer
  • “Had to do a SWMS for a very large job I was quoting on… Saved me a heap of time and for the cost of the download, was well worth it.”

    Timber Floor Sanding and Finishing SWMSVerified buyer
  • “A-Z of everything we need, more than helpful customer service and all questions answered. 1st class company!”

    Height Access Equipment SWMSVerified buyer
  • “Super easy, no hassle. When paper work is a nightmare this was a dream come true…”

    Plasterboard SWMSVerified buyer
  • “The SWMS documents are professionally laid out and easy to navigate.”

    Electrical New Installation SWMSVerified buyer
  • “This free SWMS was of excellent quality, easy to understand and apply in the field…”

    Heat Stress SWMSVerified buyer

Questions

Do workers need to download an app or create an account?

No. They sign from a text, link or QR code on any phone.

I've been sent a SafetyDocs link. What is it?

The contractor you're working for uses SafetyDocs to share safety documents. Open the link they sent, read the document, and sign with your finger. It's free, there's nothing to download, and we only ask for your name and contact details.

Do I have to book a demo or talk to sales?

No. When we launch you can start on the free plan by yourself, and every price is on this page. If you run big jobs and want to see it first, book a demo.

What happens to the templates I've already bought from your store?

They come with you into the app.

Can I still buy single templates?

Yes.

Who writes the documents?

Our team of safety experts, who have been writing safety documents since 2004.

Do I have to use electronic signatures?

No. SafetyDocs simply makes your RAMS easier to share, read and sign.

When can I start?

We're launching in late 2026 and opening access in waves. Register now to be first in.

How much will it cost?

There's a free plan, and every paid plan's price is in the plans above. Founding members get a reduced price that stays.

SafetyDocs demo30 min · video call

Loading times…

Sydney time (AEDT)

Book a demo

See it working on your jobs.

A 30-minute video call with our team. We'll show you how SafetyDocs runs a job with many companies, answer your questions and help you pick the right plan.

  • How subcontractors join, add their RAMS and sign
  • Reviewing and approving RAMS across companies
  • Roles, the audit log and Enterprise options