Inadequate planning and design
Hazards that go unrecognised or uncontrolled because the work, site conditions or design were not planned, assessed or consulted on beforehand.
Por ahora, esta página está en inglés.
Charla de seguridad gratis sobre inadequate planning and design
También conocido como: Harm from lack of planning, Inadequate preparation for tasks, Failure to assess risk, Lack of design input, Design failures, Unidentified hazards, Lack of consultation, Failure to update site conditions
Cómo controlar: inadequate planning and design
- Consider safety in design before work starts, and ask designers and engineers to remove or reduce hazards at source.
- Plan the job in steps before starting, including access, equipment, sequence, emergency arrangements and who does what.
- Assess the risks for the task and site conditions, and review the assessment when conditions or the scope of work change.
- Consult workers, other contractors and the person in control of the site, and share the plan with everyone who is affected.
- Do a pre-start walk-through and update the hazards at the start of each shift, noting anything that has changed.
- Monitor hazards throughout the job, and stop work to reassess if something unexpected comes up.
Controles habituales, del más eficaz al menos eficaz. Tu SWMS fija los controles para tu propio trabajo y tu obra.
Plantillas que cubren Inadequate planning and design















Paquete ahorro · 10 plantillas


+6
Paquete ahorro · 18 plantillas


+14
Sistema · 115 documentos


+111
Sistema · 99 documentos
+95
Paquete ahorro · 13 plantillas


+9
Paquete ahorro · 47 plantillas


+43
Sistema · 127 documentos


+123
Sistema · 143 documentos

+139
Paquete ahorro · 53 plantillas


+49SWMS por oficio
Peligros que suelen aparecer junto a este
Legislación que citan estas plantillas
- OHS Act 2004 (Vic)60 plantillas
- OHS Regulations 2017 (Vic)60 plantillas
- WHS Act 201160 plantillas
- WHS Regulations 201160 plantillas
- Code of Practice: Construction work56 plantillas
- Code of Practice: First aid in the workplace56 plantillas
- Code of Practice: How to manage WHS risks56 plantillas
- Code of Practice: Work environment and facilities56 plantillas