Underground and concealed services 툴박스 미팅

이 페이지는 현재 영어로만 제공됩니다.

작업 전 회의(pre-start)나 툴박스 미팅에서 읽어 주고, 질문을 함께 이야기한 뒤, 모두 서명하게 하세요. 저희 underground and concealed services 페이지와 이를 다루는 SafetyDocs 템플릿 100개를 바탕으로 만들었습니다.

현장
날짜
진행자

무엇인가요

Striking buried or concealed pipes, cables and other utilities when digging, drilling, piling or breaking into ground, walls or ceilings.

확인할 관리 조치 (효과가 큰 순서)

  1. Get current plans from Before You Dig Australia and the asset owners, and request a site meeting where services are complex or critical.
  2. Plan the job to avoid digging near services, and relocate or de-energise services that cannot be avoided before work starts.
  3. Locate services on site with an electronic locator, and confirm their position by potholing with non-destructive methods such as vacuum excavation before using mechanical plant.
  4. Mark service positions on the ground and on plans, and keep a record of them for any future excavation at the same location.
  5. Dig by hand or with vacuum equipment near marked services, and use a spotter to watch the excavation while plant is working.
  6. If a service is struck, stop work, keep everyone clear and call the asset owner and emergency services, and never repair or cover the damage yourself.

작업자에게 할 질문

  1. 오늘 이 작업에서 어디서 underground and concealed services 위험이 생길 수 있나요?
  2. 가장 효과적인 관리 조치는 “Get current plans from Before You Dig Australia and the asset owners, and request a site meeting where services are complex or critical”입니다. 여기서 할 수 있나요? 할 수 없다면 왜 그런가요?
  3. 이 현장에서 빠졌거나 제대로 작동하지 않는 underground and concealed services 관리 조치는 무엇인가요?
  4. underground and concealed services 때문에 작업을 멈춰야 하는 때는 언제이고, 누구에게 알리나요?
  5. 이 작업에서 위험 요소, 아차 사고, 사고는 어떻게 보고하나요?