얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

High Pressure Water Cleaner

SWMS · SWMS-10189

High Pressure Water Cleaner SWMS 템플릿 미리보기
  • 작업 단계 10개
  • 423회 구매됨
  • 버전 10
  • Cleaning
  • 어떤 휴대폰에서든 읽기 가능

This High Pressure Water Cleaner Safe Work Method Statement (SWMS) covers the hazards and controls of operating petrol or electric-powered high-pressure water jet cleaners that use cold water, hot water and steam. It sets out how to operate a pressure washer safely and what safety equipment to use.

It covers 10 job steps, from working alone, arriving at site and setting up the work area to environment, housekeeping, manual tasks, operating the pressure cleaner, refuelling, completion and emergency response.

It includes controls for mobile plant movement and hazardous atmospheres, and for pressurised water, electricity, hot water and steam, asbestos, lead, noise and slips, trips and falls.

It suits construction contractors, cleaning services and maintenance teams who operate high-pressure water cleaners.

High Pressure Water Cleaner SWMS 미리 보기

High Pressure Water Cleaner

SWMSVersion 10
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Contact phone #
—
Signature
—
Date
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection

Job steps, hazards and controls

  • Work activity

    Working alone

    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Ensure a second person knows your location and expected time of return

      • Use mobile phone, telephone or radio to periodically check-in

      • Communication equipment within easy reach at all times

      • Take extra care to work safely and methodically

      • Have a first aid kit readily available and stocked appropriately.

      After controls2 Moderate
      Responsible
      • Operatorto maintain call logins

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 9개 더: Arrival at site부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 템플릿 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 회사 정보는 자동으로 채워집니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 템플릿은 1입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $89.95 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

다루는 내용

작업 단계 10개

  1. Working aloneKeep in contact when working alone
  2. Arrival at sitePosition the vehicle, report in and check the site
  3. Work area set upSet up exclusion zones and make power and fuel units safe
  4. EnvironmentControl noise, waste, spills and runoff
  5. House keepingKeep the work area, hoses and leads clear
  6. Manual tasksUnload and move the pressure unit safely
  7. Operating the pressure cleanerCheck and operate the pressure cleaner safely
  8. RefuellingRefuel away from ignition sources
  9. On completionShut down, drain and store the unit, and sign out
  10. Emergency responseCall 000, apply first aid and report incidents

다루는 위험 요소

리뷰

아직 리뷰가 없습니다.

모두 보기

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.