Inflatable Amusement Device

SWMS · SWMS-10690

Inflatable Amusement Device SWMS 템플릿 미리보기
  • 작업 단계 12개
  • 버전 1
  • Miscellaneous
  • 어떤 휴대폰에서든 읽기 가능

This SWMS offers a structured approach to safely managing inflatable amusement devices at events or worksites. It covers every step so that safety requirements are met, risks are minimised and both operators and patrons are protected.

It takes you through planning, training and competency, maintaining the log book, manual handling, transporting the device, parking and unloading, assessing on-site conditions, setting up, operating the device, dismantling, emergency response and incident management, with risk assessments and control measures for each step.

It suits event organisers, amusement companies and any business that operates inflatable devices and needs to manage workplace risks and meet health and safety laws.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Inflatable Amusement Device SWMS 미리 보기

Inflatable Amusement Device

SWMSVersion 1
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site Management Plan

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Energised ElectricalEnergised electrical installations or services

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • The principal contractor will confirm that emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training and licences

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on-site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings, toolbox talks

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS is to be reviewed and amended, if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP.

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Lack of planning

      Before controls3 High
      Controls
      • Ensure the device is registered if required.

      • Implement an emergency plan and ensure all workers are trained.

      • Provide accessible first aid equipment and trained personnel.

      • Obtain any necessary council permits or landowner permissions before setting up the inflatable device, ensuring compliance with local regulations.

      After controls2 Moderate
      Responsible
      • Supervisorto ensure all appropriate requirements are met

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 11개 더: Training and competency부터 Incident management까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 템플릿 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 회사 정보는 자동으로 채워집니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 템플릿은 1입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $89.95 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

다루는 내용

작업 단계 12개

  1. PlanningCoordinate with the principal contractor and confirm emergency response procedures.
  2. Training and competencyConfirm workers' certifications, training and knowledge of emergency procedures.
  3. Maintaining the log bookKeep accurate records of device maintenance, repairs and operations.
  4. Manual handling during:Handle the device safely when loading, unloading, setting up and dismantling.
  5. Transporting the deviceSecure the device during transport to prevent damage.
  6. Parking and unloadingPark vehicles and unload the device and equipment safely.
  7. Assess on-site conditionsAssess ground stability, environmental risks and electrical hazards before setup.
  8. Setting upAnchor the device and check it for misalignment or damage before use.
  9. Operating the deviceOperate the device safely, monitoring patron behaviour, overcrowding and high winds.
  10. DismantlingDismantle the device and inspect it for damage before transport.
  11. Emergency responseFollow emergency procedures, including evacuation and device deflation.
  12. Incident managementReport and document incidents and address any safety issues.

다루는 위험 요소

리뷰

아직 리뷰가 없습니다.

모두 보기

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.