Remote-Isolated Work

SWMS · SWMS-10336

Xem trước mẫu SWMS Remote-Isolated Work
  • 9 bước công việc
  • Đã được mua 163 lần
  • Phiên bản 6
  • Miscellaneous
  • Đọc được trên mọi điện thoại

This Remote-Isolated Work Safe Work Method Statement (SWMS) is for use by relevant workers engaged in work activities in isolation or remote areas, or who work alone in a workplace. Tasks carried out at a remote worksite, or general workplace, require a SWMS specific to that work.

It covers nine job steps: preparing a remote or isolated work plan, planning, powered mobile plant and equipment, training, arrival on site and assessing site conditions, remote or isolated work, checking weather conditions and preparing, completion, and emergency response.

A worker who is isolated at a workplace by factors such as working at night or working unsupervised, whether or not in a remote location, is at high risk and should be included in remote and isolated worker risk assessments and SWMS. Examples include a contract cleaner who cleans offices or factories after hours, a farm worker, a shop assistant who works alone in a shop and a community worker who makes home visits.

Xem trước SWMS Remote-Isolated Work

Remote-Isolated Work

SWMSVersion 6
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. (specify the hold points)

Training and licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection

Job steps, hazards and controls

  • Work activity

    Prepare a Remote / Isolated Work Plan

    • Hazard

      Remote area emergency

      Before controls4 Acute
      Controls
      • A signed copy must be taken by workers to the Remote/Isolated workplace each day, and a copy must be kept by the Responsible Supervisor at home base and/or head office

      • All relevant workers scheduled to work in the remote area are supplied with Personal Location Beacons (PLB)

      • All vehicles used to transport crew to remote locations are carrying Emergency Position Indicating Radio Beacon (EPIRB) onboard vehicle:

        • Cabin roof is clearly marked with a specific identification number (for helicopter Id.)

      • Complete a Departure Checklist.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 8 bước công việc, từ Planning đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy mẫu này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Thông tin công ty của bạn sẽ được điền sẵn.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 1 lượt.

    So sánh các gói và giá
  • Mua một lần

    $89.95 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

9 bước công việc

  1. Prepare a Remote / Isolated Work PlanPrepare the work plan, supply location beacons and complete a departure checklist
  2. PlanningArrange accommodation, amenities and supplies for the project
  3. Powered mobile plant & equipmentProvide plant documents, check tools and guard powered equipment
  4. TrainingTrain workers for remote and isolated work and its emergencies
  5. Arrival on-site & assess onsite conditionsNotify base on arrival, then check the site and assess the risks
  6. Remote / isolated workUse a buddy for high-risk tasks and follow the call-in logs
  7. Check weather conditions & prepareGuard against snake and spider bites and extreme weather
  8. On completionPack and inspect equipment and notify base when leaving
  9. Emergency responseRespond to emergencies and escalate failed check-ins

Các mối nguy được đề cập

Đánh giá

Chưa có đánh giá nào.

Xem tất cả

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.