抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

Adverse weather班前安全会讲稿

本页面目前仅提供英文版。

在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的adverse weather页面,以及涵盖这项危险的 440 个 SafetyDocs 模板。

工地
日期
主讲人

它是什么

Wind, rain, storms, heat or cold that make work unsafe, especially at height or outdoors.

要检查的控制措施,最有效的排在前面

  1. Check forecasts and Bureau of Meteorology warnings before starting, and reschedule outdoor or at-height work when severe weather is expected.
  2. Set wind stop-work triggers for cranes, elevated work platforms and scaffold work, using the manufacturer's limits for each item of plant.
  3. Secure loose sheeting, materials and tools, and take down signs or screens that could become windborne in strong gusts.
  4. Stop work and move to shelter at the first sign of lightning, keeping away from tall plant and metal structures.
  5. Inspect scaffolds, excavations and access routes after storms or heavy rain before anyone resumes work.
  6. Provide wet-weather gear and slip-resistant footwear, and treat wet surfaces as slip hazards until they dry.

在工作中哪些环节会遇到

SafetyDocs 模板中涉及adverse weather的工作步骤:

给工人的问题

  1. 今天这项工作中,哪里可能会遇到adverse weather?
  2. 今天的工作中有没有以下内容:Check weather conditions & prepare; Weather conditions; Check weather conditions and prepare?
  3. 最有效的控制措施是:“Check forecasts and Bureau of Meteorology warnings before starting, and reschedule outdoor or at-height work when severe weather is expected”。我们这里能做到吗?如果不能,为什么?
  4. 这个工地上有哪些针对adverse weather的控制措施缺失或不起作用?
  5. 你会在什么情况下因为adverse weather停工?你会告诉谁?
  6. 在这项工作中,我们怎么报告危险、险情或事故?

签到记录

所有参会人员在下方签字。请和你的班前安全会记录一起保存。

姓名公司签名

这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。