Cold stress班前安全会讲稿
本页面目前仅提供英文版。
在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的cold stress页面,以及涵盖这项危险的 355 个 SafetyDocs 模板。
- 工地
- 日期
- 主讲人
它是什么
Cold, wet or windy conditions that cool the body faster than it can warm itself, causing shivering, numbness and hypothermia.
要检查的控制措施,最有效的排在前面
- Schedule outdoor or cold-room work for the warmer parts of the day, and limit time spent in cold, wet conditions.
- Provide heated shelters or warm break areas with warm drinks, and build regular warm-up breaks into the work.
- Use windbreaks and keep workers dry, because wet clothing and wind cool the body much faster.
- Train workers and supervisors to recognise shivering, numbness, clumsiness and confusion as early signs of hypothermia, and act on them.
- Provide layered clothing, insulated gloves and headwear, and waterproof outer layers suited to the conditions.
在工作中哪些环节会遇到
SafetyDocs 模板中涉及cold stress的工作步骤:
- Check weather conditions & prepareCheck the weather and manage hot and cold conditions来自 Brick Cleaning
- Working outdoorsProvide first aid for bites and stings and manage hot and cold conditions来自 Gang Mower
给工人的问题
- 今天这项工作中,哪里可能会遇到cold stress?
- 最有效的控制措施是:“Schedule outdoor or cold-room work for the warmer parts of the day, and limit time spent in cold, wet conditions”。我们这里能做到吗?如果不能,为什么?
- 这个工地上有哪些针对cold stress的控制措施缺失或不起作用?
- 你会在什么情况下因为cold stress停工?你会告诉谁?
- 在这项工作中,我们怎么报告危险、险情或事故?
签到记录
所有参会人员在下方签字。请和你的班前安全会记录一起保存。
| 姓名 | 公司 | 签名 |
|---|---|---|
这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。