Crane and load collision班前安全会讲稿
本页面目前仅提供英文版。
在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的crane and load collision页面,以及涵盖这项危险的 73 个 SafetyDocs 模板。
- 工地
- 日期
- 主讲人
它是什么
A crane, its boom or a suspended load striking another crane, a structure or people, often where cranes share airspace.
要检查的控制措施,最有效的排在前面
- Plan crane positions and slewing paths so working radii don't overlap, or set a no-go zone for each crane where they must.
- Check for structures, scaffolds and power lines within the crane's working envelope before set-up.
- Use anti-collision systems or spotters to keep cranes, booms and loads apart where cranes share airspace.
- Agree a lift plan and a communication channel with other crane operators, doggers and spotters before lifting.
- Use tag lines to control load rotation, and keep people out from under and beside suspended loads.
- Stop lifting when visibility or wind reduces the operator's control of the load.
给工人的问题
- 今天这项工作中,哪里可能会遇到crane and load collision?
- 最有效的控制措施是:“Plan crane positions and slewing paths so working radii don't overlap, or set a no-go zone for each crane where they must”。我们这里能做到吗?如果不能,为什么?
- 这个工地上有哪些针对crane and load collision的控制措施缺失或不起作用?
- 你会在什么情况下因为crane and load collision停工?你会告诉谁?
- 在这项工作中,我们怎么报告危险、险情或事故?
签到记录
所有参会人员在下方签字。请和你的班前安全会记录一起保存。
| 姓名 | 公司 | 签名 |
|---|---|---|
这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。