Falling objects班前安全会讲稿
本页面目前仅提供英文版。
在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的falling objects页面,以及涵盖这项危险的 377 个 SafetyDocs 模板。
- 工地
- 日期
- 主讲人
它是什么
Tools, materials or debris falling from height onto people below.
要检查的控制措施,最有效的排在前面
- Pre-assemble or prefabricate at ground level to reduce the tools and materials needed at height.
- Fit toeboards, mesh screens, catch platforms or debris netting on scaffolds and open edges.
- Set up exclusion zones with barricades and signs below overhead work, and keep people out while it is under way.
- Tether tools at height, and keep materials stacked and secured away from edges and openings.
- Lower debris in containers or through enclosed chutes instead of throwing it from height.
- Wear hard hats wherever objects could fall from above, including when passing beneath scaffolds and cranes.
在工作中哪些环节会遇到
SafetyDocs 模板中涉及falling objects的工作步骤:
- Falling objects (collapsing clutter)Bodily injuries来自 Hoarder Cleaning Plan
- Work area set-upSet up exclusion zones and edge protection, and protect people below from falling objects来自 Roofing - Tiled
- Installing pipeworkInstall pipework, controlling falling objects, tools, cutting and silica dust来自 Plumbing Suspended Pipework
- Ceiling installationInstall the ceiling from safe trestles and ladders, controlling electricity, falling objects, cuts and silica dust来自 Suspended Grid System Ceiling Installation
- Installing replacement partsInstall replacement parts from the EWP, guarding against falls and falling objects.来自 Cool Room Repair
给工人的问题
- 今天这项工作中,哪里可能会遇到falling objects?
- 今天的工作中有没有以下内容:Falling objects (collapsing clutter)?
- 最有效的控制措施是:“Pre-assemble or prefabricate at ground level to reduce the tools and materials needed at height”。我们这里能做到吗?如果不能,为什么?
- 这个工地上有哪些针对falling objects的控制措施缺失或不起作用?
- 你会在什么情况下因为falling objects停工?你会告诉谁?
- 在这项工作中,我们怎么报告危险、险情或事故?
签到记录
所有参会人员在下方签字。请和你的班前安全会记录一起保存。
| 姓名 | 公司 | 签名 |
|---|---|---|
这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。