Night work and poor visibility班前安全会讲稿
本页面目前仅提供英文版。
在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的night work and poor visibility页面,以及涵盖这项危险的 57 个 SafetyDocs 模板。
- 工地
- 日期
- 主讲人
它是什么
Working in the dark, in low light or where dust, smoke, fog or glare stops people seeing hazards, plant and one another.
要检查的控制措施,最有效的排在前面
- Schedule work for daylight hours where possible, and delay work when fog, dust, smoke or heavy rain cuts visibility.
- Light the whole work area, access routes and plant movement paths, using towers or work lights that are positioned to avoid glare for workers and passing motorists.
- Keep clear sightlines by cleaning mirrors, windscreens and lights, and removing obstructions from plant and work areas.
- Separate people from plant with barriers and spotters, and use extra signs, reflective delineation and flashing lights at night.
- Manage fatigue for night shifts with rostered rest breaks, and check workers are fit to drive home after a shift.
- Wear high-visibility clothing with reflective strips suited to night work, and carry a torch or head lamp.
在工作中哪些环节会遇到
SafetyDocs 模板中涉及night work and poor visibility的工作步骤:
- Construction Night WorksDo not work alone at night, wear high-visibility vests, keep lighting adequate and manage fatigue, drugs, alcohol and weather来自 Construction Night Works
- PlanningNotify local authorities, plan transport and exclusion zones, and plan breaks and weather checks for night work来自 Construction Night Works
- Work area set upSet up lighting, back-up power, illuminated plant and signs, and roadside barriers for the night work zone来自 Construction Night Works
给工人的问题
- 今天这项工作中,哪里可能会遇到night work and poor visibility?
- 今天的工作中有没有以下内容:Construction Night Works?
- 最有效的控制措施是:“Schedule work for daylight hours where possible, and delay work when fog, dust, smoke or heavy rain cuts visibility”。我们这里能做到吗?如果不能,为什么?
- 这个工地上有哪些针对night work and poor visibility的控制措施缺失或不起作用?
- 你会在什么情况下因为night work and poor visibility停工?你会告诉谁?
- 在这项工作中,我们怎么报告危险、险情或事故?
签到记录
所有参会人员在下方签字。请和你的班前安全会记录一起保存。
| 姓名 | 公司 | 签名 |
|---|---|---|
这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。