Structural collapse班前安全会讲稿
本页面目前仅提供英文版。
在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的structural collapse页面,以及涵盖这项危险的 59 个 SafetyDocs 模板。
- 工地
- 日期
- 主讲人
它是什么
Walls, frames, floors, ceilings, shafts, platforms or temporary works that give way or move unexpectedly during construction, demolition or alteration.
要检查的控制措施,最有效的排在前面
- Have an engineer assess the structure and the work sequence before demolition or alteration, and follow their written method.
- Design and install temporary works, such as props, bracing, shoring and formwork, to the engineer's plan and have them checked before anyone works near them.
- Do not remove, move or alter props, braces or load-bearing elements without engineering approval, and tag temporary works so tampering is obvious.
- Set exclusion zones around structures at risk of collapse, and keep people and plant out of the fall zone.
- Inspect structures and temporary works at the start of each shift and after wind, rain, impact or vibration, and stop work if anything has moved or cracked.
- Limit loads on floors, roofs and platforms to their rated capacity, and keep stored materials and plant away from unsupported edges and walls.
给工人的问题
- 今天这项工作中,哪里可能会遇到structural collapse?
- 最有效的控制措施是:“Have an engineer assess the structure and the work sequence before demolition or alteration, and follow their written method”。我们这里能做到吗?如果不能,为什么?
- 这个工地上有哪些针对structural collapse的控制措施缺失或不起作用?
- 你会在什么情况下因为structural collapse停工?你会告诉谁?
- 在这项工作中,我们怎么报告危险、险情或事故?
签到记录
所有参会人员在下方签字。请和你的班前安全会记录一起保存。
| 姓名 | 公司 | 签名 |
|---|---|---|
这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。