本页面目前仅提供英文版。

在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的underground and concealed services页面,以及涵盖这项危险的 100 个 SafetyDocs 模板。

工地
日期
主讲人

它是什么

Striking buried or concealed pipes, cables and other utilities when digging, drilling, piling or breaking into ground, walls or ceilings.

要检查的控制措施,最有效的排在前面

  1. Get current plans from Before You Dig Australia and the asset owners, and request a site meeting where services are complex or critical.
  2. Plan the job to avoid digging near services, and relocate or de-energise services that cannot be avoided before work starts.
  3. Locate services on site with an electronic locator, and confirm their position by potholing with non-destructive methods such as vacuum excavation before using mechanical plant.
  4. Mark service positions on the ground and on plans, and keep a record of them for any future excavation at the same location.
  5. Dig by hand or with vacuum equipment near marked services, and use a spotter to watch the excavation while plant is working.
  6. If a service is struck, stop work, keep everyone clear and call the asset owner and emergency services, and never repair or cover the damage yourself.

给工人的问题

  1. 今天这项工作中,哪里可能会遇到underground and concealed services?
  2. 最有效的控制措施是:“Get current plans from Before You Dig Australia and the asset owners, and request a site meeting where services are complex or critical”。我们这里能做到吗?如果不能,为什么?
  3. 这个工地上有哪些针对underground and concealed services的控制措施缺失或不起作用?
  4. 你会在什么情况下因为underground and concealed services停工?你会告诉谁?
  5. 在这项工作中,我们怎么报告危险、险情或事故?

签到记录

所有参会人员在下方签字。请和你的班前安全会记录一起保存。

姓名公司签名

这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。