Unstable ground班前安全会讲稿
本页面目前仅提供英文版。
在开工前会或班前安全会上读出来,一起讨论这些问题,并让每个人签到。内容来自我们的unstable ground页面,以及涵盖这项危险的 153 个 SafetyDocs 模板。
- 工地
- 日期
- 主讲人
它是什么
Soft, uneven or sloping ground that can let equipment, scaffolds or ladders sink, tip or move.
要检查的控制措施,最有效的排在前面
- Assess ground conditions before bringing in plant or erecting scaffolds, considering recent rain, fill and nearby excavations.
- Use ground mats, sole boards or outrigger pads to spread loads on soft or uneven ground.
- Keep plant, materials and spoil back from excavation edges and embankments.
- Get geotechnical or engineering advice where ground stability is uncertain, such as near trenches, fill or retaining walls.
- Re-check ground after rain, and stop work if plant, scaffolds or ladders start to sink or shift.
给工人的问题
- 今天这项工作中,哪里可能会遇到unstable ground?
- 最有效的控制措施是:“Assess ground conditions before bringing in plant or erecting scaffolds, considering recent rain, fill and nearby excavations”。我们这里能做到吗?如果不能,为什么?
- 这个工地上有哪些针对unstable ground的控制措施缺失或不起作用?
- 你会在什么情况下因为unstable ground停工?你会告诉谁?
- 在这项工作中,我们怎么报告危险、险情或事故?
签到记录
所有参会人员在下方签字。请和你的班前安全会记录一起保存。
| 姓名 | 公司 | 签名 |
|---|---|---|
这是班前安全会的参考起点,不是 SWMS,也不是风险评估。请补充你的工地和工人的具体情况。