عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

حزمة توفير · 21 نماذج

Fibreglass Pool Installation Combo

حزمة توفير · PACK-50329

معاينة نموذج حزمة توفير Fibreglass Pool Installation Combo
  • 21 نماذج
  • 21 بسعر 16
  • يصل في مجلد واحد في المكتبة

A set of 15 SWMS and six SOPs for fibreglass pool installers.

The SWMS cover pool covers and rollers, pool heating, earthmoving, fencing, paving and mini loader operation. The SOPs include Falls from Heavy Vehicles, Excavator and Mini Loader.

Each document is the same one sold on its own, so you get every update to it. Together they cost 16 template credits instead of 21.

معاينة SWMS Pool Covers - Rollers

Pool Covers - Rollers

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous Lineschemical, fuel or refrigerant lines
  • Energised Electricalenergised electrical installations or services
  • Water & DrowningIn or near water or other liquid that involves the risk of drowning

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold Points

Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

13 خطوات عمل أخرى، من Check weather conditions & prepare إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 16 بدلًا من 21.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $1,439.20 $1,888.95 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Pool Covers - Rollers

    SWMS · 14 خطوات عمل

    SWMS for installing pool covers and rollers: silica dust, drilling near services, working at height, mounting covers near water and emergencies.

    يُباع أيضًا منفردًا
  2. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  3. Handheld Power Tools

    SOP · 9 أقسام

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  4. Pool Solar Heating

    SWMS · 16 خطوات عمل

    Pool Solar Heating SWMS: 16 job steps covering roof access, panel and pump installation, silica dust, tools and emergency response.

    يُباع أيضًا منفردًا
  5. Temporary Fencing

    SWMS · 11 خطوات عمل

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    يُباع أيضًا منفردًا
  6. Manual Handling

    SOP · 5 أقسام

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    يُباع أيضًا منفردًا
  7. Paving

    SWMS · 19 خطوات عمل

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    يُباع أيضًا منفردًا
  8. Fencing

    SWMS · 16 خطوات عمل

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    يُباع أيضًا منفردًا
  9. Hand Tools

    SOP · 9 أقسام

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    يُباع أيضًا منفردًا
  10. Earthmoving Equipment

    SWMS · 23 خطوات عمل

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    يُباع أيضًا منفردًا
  11. Falls from Heavy Vehicles

    SOP · 7 أقسام

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    يُباع أيضًا منفردًا
  12. Powered Non-powered Tools

    SWMS · 12 خطوات عمل

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    يُباع أيضًا منفردًا
  13. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  14. Excavator

    SOP · 9 أقسام

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    يُباع أيضًا منفردًا
  15. Mini Loader Operation

    SWMS · 20 خطوات عمل

    SWMS for mini loader operation: site set-up, working alone, delivery, lifting, trenching, underground services, attachments, refuelling and emergencies.

    يُباع أيضًا منفردًا
  16. Pool Gas Heater-Heat Pump

    SWMS · 17 خطوات عمل

    Pool Gas Heater-Heat Pump SWMS: 17 job steps for positioning, installing and testing swimming pool gas heaters and heat pumps.

    يُباع أيضًا منفردًا
  17. Mini Loader

    SOP · 9 أقسام

    Safe operating procedure for a mini loader: hazards, PPE, inspection, operation, attachments, slopes, fuelling, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  18. Tipper and Dog

    SWMS · 16 خطوات عمل

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    يُباع أيضًا منفردًا
  19. Concrete Slab on Ground

    SWMS · 17 خطوات عمل

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    يُباع أيضًا منفردًا
  20. Crane Truck Mounted

    SWMS · 16 خطوات عمل

    SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.

    يُباع أيضًا منفردًا
  21. Fibreglass Pool Installation

    SWMS · 17 خطوات عمل

    Fibreglass pool installation SWMS: 17 job steps covering excavation, lifting the pool into position, pipework, concrete and emergencies.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Pool Covers - Rollers14$89.95 · رصيد واحد
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Handheld Power Tools0$89.95 · رصيد واحد
Pool Solar Heating16$89.95 · رصيد واحد
Temporary Fencing11$89.95 · رصيد واحد
Manual Handling0$89.95 · رصيد واحد
Paving19$89.95 · رصيد واحد
Fencing16$89.95 · رصيد واحد
Hand Tools0$89.95 · رصيد واحد
Earthmoving Equipment23$89.95 · رصيد واحد
Falls from Heavy Vehicles0$89.95 · رصيد واحد
Powered Non-powered Tools12$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Excavator0$89.95 · رصيد واحد
Mini Loader Operation20$89.95 · رصيد واحد
Pool Gas Heater-Heat Pump17$89.95 · رصيد واحد
Mini Loader0$89.95 · رصيد واحد
Tipper and Dog16$89.95 · رصيد واحد
Concrete Slab on Ground17$89.95 · رصيد واحد
Crane Truck Mounted16$89.95 · رصيد واحد
Fibreglass Pool Installation17$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$1,888.95 · 21 أرصدة
ضمن هذه الحزمة$1,439.20 · 16 أرصدة توفّر $449.75

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.