Glass Whiteboard Installation

SWMS · SWMS-10596

معاينة نموذج SWMS Glass Whiteboard Installation
  • 12 خطوات عمل
  • النسخة 3
  • Glazing
  • يُقرأ على أي هاتف

This SWMS gives an overview of the job steps, hazards and controls involved in installing prefabricated glass whiteboards. It includes transporting the whiteboards to site and the general safe handling needed during installation.

It takes your crew through each step, from preparation, transport and unloading to ladders and trestle scaffold, gluing the MDF-backed whiteboard to the wall, mounting, completion and emergency response.

It suits contractors, construction workers and any professionals who install glass whiteboards, as a guide to staying safe during the installation.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

معاينة SWMS Glass Whiteboard Installation

Glass Whiteboard Installation

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Business contact phone
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Gas MainsWork on or near pressurised gas distribution mains or piping
  • Hazardous LinesWork on or near chemical, fuel or refrigerant lines
  • Energised ElectricalWork on or near energised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures is in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training.

  • Specify the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended, if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Preparation

    • Hazard

      Inappropriate delivery time

      Before controls3 High
      Controls
      • Notify site manager to arrange a dedicated time for delivery.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

11 خطوات عمل أخرى، من Transporting glass إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على هذا النموذج

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. تُعبّأ بيانات شركتك تلقائيًا.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذا النموذج 1.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $89.95 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يغطيه

12 خطوات عمل

  1. PreparationCoordinate with the principal contractor to understand site safety systems.
  2. Transporting glassTransport the glass safely, with a compliant vehicle and a secure load.
  3. Arrival on-site & assess onsite conditionsCheck the site for safety compliance on arrival.
  4. Work area set-up & unloadingSet up a safe work area and unload the materials securely.
  5. Glass handling & movement on-siteHandle and move the glass safely within the site.
  6. Working on ladders and/or trestle scaffoldUse ladders and trestle scaffold safely.
  7. EnvironmentManage the environmental impacts of the installation.
  8. House keepingKeep the site clean and orderly to prevent accidents.
  9. Gluing MDF backed glass whiteboard to wallApply the adhesive and position the whiteboard safely.
  10. Mount & whiteboard installationFix the whiteboard securely to the wall.
  11. On completionDo the final checks and clean up on completion.
  12. Emergency responseRespond to emergencies.

المخاطر التي يغطيها

المراجعات

لا توجد مراجعات بعد.

اعرض الكل

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.