Glazing Combo

حزمة توفير · PACK-50403

معاينة نموذج حزمة توفير Glazing Combo
  • 18 نماذج
  • 18 بسعر 13
  • يصل في مجلد واحد في المكتبة

A set of eight SWMS, seven SOPs, one plan and two forms for glaziers.

The SWMS cover glazing, structural glazing, vacuum lifting attachments, glass lifters and window and door frames. The SOPs include Mobile Scaffolding, Hand Tools and Platform Ladder. It also includes Falls Emergency Rescue Plan, SOP Template and JSEA Template.

Each document is the same one sold on its own, so you get every update to it. Together they cost 13 template credits instead of 18.

معاينة SWMS Height Access Equipment

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 خطوات عمل أخرى، من Work area set-up إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 13 بدلًا من 18.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $1,169.35 $1,619.10 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Height Access Equipment

    SWMS · 17 خطوات عمل

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    يُباع أيضًا منفردًا
  2. Glazing

    SWMS · 15 خطوات عمل

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    يُباع أيضًا منفردًا
  3. Falls Emergency Rescue Plan

    خطة إدارة · 14 أقسام

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    يُباع أيضًا منفردًا
  4. Glazing Vacuum Lifting Attachment

    SWMS · 13 خطوات عمل

    Glazing vacuum lifting attachment SWMS: 13 job steps from training and site checks to lifter operation, attachment changes and emergencies.

    يُباع أيضًا منفردًا
  5. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  6. Glazing Structural

    SWMS · 14 خطوات عمل

    Controls for structural glazing, covering mobile plant, asbestos, gas mains, energised services and falls, across 14 job steps.

    يُباع أيضًا منفردًا
  7. SOP Template

    نموذج تعبئة · 9 حقول

    A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.

    يُباع أيضًا منفردًا
  8. JSEA Template

    نموذج تعبئة · 8 حقول

    A Job Safety & Environmental Analysis (JSEA) form to complete before work starts on a new site or on arrival at the site each day.

    يُباع أيضًا منفردًا
  9. Building Maintenance Unit BMU

    SWMS · 12 خطوات عمل

    Building Maintenance Unit BMU SWMS: 12 job steps covering BMU set-up, fall restraint, falls rescue, electrical hazards and emergency response.

    يُباع أيضًا منفردًا
  10. Aluminium Window Door Frame Installation

    SWMS · 15 خطوات عمل

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    يُباع أيضًا منفردًا
  11. Glass Lifter

    SWMS · 15 خطوات عمل

    Glass Lifter SWMS: 15 job steps covering transport, set-up, lifter operation, crane lifts, maintenance, battery charging and emergencies.

    يُباع أيضًا منفردًا
  12. Hand Tools

    SOP · 9 أقسام

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    يُباع أيضًا منفردًا
  13. Platform Ladder

    SOP · 7 أقسام

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    يُباع أيضًا منفردًا
  14. Trestle Scaffold

    SOP · 7 أقسام

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    يُباع أيضًا منفردًا
  15. Utility-Box Cutter Knife

    SOP · 7 أقسام

    Safe operating procedure for a utility-box cutter knife: hazards, PPE, precautions, operation, emergency response and a training register.

    يُباع أيضًا منفردًا
  16. Mobile Scaffolding

    SOP · 8 أقسام

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    يُباع أيضًا منفردًا
  17. Scissor Lift

    SOP · 10 أقسام

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    يُباع أيضًا منفردًا
  18. Handheld Power Tools

    SOP · 9 أقسام

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Height Access Equipment17$89.95 · رصيد واحد
Glazing15$89.95 · رصيد واحد
Falls Emergency Rescue Plan0$89.95 · رصيد واحد
Glazing Vacuum Lifting Attachment13$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Glazing Structural14$89.95 · رصيد واحد
SOP Template0$89.95 · رصيد واحد
JSEA Template0$89.95 · رصيد واحد
Building Maintenance Unit BMU12$89.95 · رصيد واحد
Aluminium Window Door Frame Installation15$89.95 · رصيد واحد
Glass Lifter15$89.95 · رصيد واحد
Hand Tools0$89.95 · رصيد واحد
Platform Ladder0$89.95 · رصيد واحد
Trestle Scaffold0$89.95 · رصيد واحد
Utility-Box Cutter Knife0$89.95 · رصيد واحد
Mobile Scaffolding0$89.95 · رصيد واحد
Scissor Lift0$89.95 · رصيد واحد
Handheld Power Tools0$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$1,619.10 · 18 أرصدة
ضمن هذه الحزمة$1,169.35 · 13 أرصدة توفّر $449.75

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.