Line Marking

SWMS · SWMS-10421

معاينة نموذج SWMS Line Marking
  • 13 خطوات عمل
  • اشتُري 151 مرة
  • النسخة 6
  • Civil Works
  • يُقرأ على أي هاتف

This Line Marking Safe Work Method Statement (SWMS) covers the hazards and controls for carrying out line-marking tasks with an airless line-marking machine on concrete and bitumen surfaces.

It sets out 13 job steps, from planning and work area set-up to line marking, refuelling, completion and emergency response, with the hazards, controls and responsible people for each step. It covers work next to traffic, environmental protection, hazardous substances and fire.

It suits roadwork contractors, car park maintenance teams, sports facility maintenance crews and construction companies that need line marking, particularly near traffic or with hazardous substances.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

معاينة SWMS Line Marking

Line Marking

SWMSVersion 6
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Unpermitted work

      Before controls3 High
      Controls
      • Obtain written consent from Coordinating Road Authority if applicable.

        Example:

        • Minor works with no traffic impact = no consent required

        • Where traffic is impacted, consent is required

        • Roads other than freeways, minor works = no consent.

      • Car park - Liaise with Principal Contractor to confirm car park closure for the duration of operations.

      After controls2 Moderate
      Responsible
      • Supervisorto undertake all planning processes

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

12 خطوات عمل أخرى، من Check weather conditions & prepare إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على هذا النموذج

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. تُعبّأ بيانات شركتك تلقائيًا.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذا النموذج 1.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $89.95 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يغطيه

13 خطوات عمل

  1. PlanningGet road authority consent where needed and confirm any car park closure
  2. Check weather conditions & prepareCheck the weather and protect workers from heat and cold
  3. Arrival on-site & assess onsite conditionsPark safely, report in and check the site before work
  4. Work area set-upSet up traffic management, pedestrian controls and fire protection
  5. EnvironmentControl noise, waste, fuel, paint and other environmental impacts
  6. House keepingKeep the work area clean, lit and free of trip hazards
  7. Manual tasksHandle paint containers and equipment without strain
  8. Working with powered & non-powered toolsInspect and use powered and non-powered tools safely
  9. Hazardous substance /chemical useTransport and use chemicals, paint and fuel safely
  10. Line markingRun the line-marking machine safely around traffic, people and plant
  11. Fuelling on-siteRefuel following the manufacturer's instructions and avoid contact with fuel
  12. On completionSecure plant and the site, and sign out
  13. Emergency responseCall 000, follow emergency procedures and give first aid

المخاطر التي يغطيها

المراجعات

  • Quality product and easy to use at short notice

    Jasin Atkinsonعملية شراء موثّقة

اعرض الكل

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.