عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

حزمة توفير · 20 نماذج

Painting and Decorating Combo

حزمة توفير · PACK-50344

معاينة نموذج حزمة توفير Painting and Decorating Combo
  • 20 نماذج
  • 20 بسعر 15
  • يصل في مجلد واحد في المكتبة

A set of ten SWMS, nine SOPs and one plan for painters and decorators.

The SWMS cover painting and decorating, lead paint removal, high pressure water cleaning, hazardous chemicals, roof work and asbestos awareness. The SOPs include Mobile Scaffolding, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 15 template credits instead of 20.

معاينة SWMS Asbestos Awareness

Asbestos Awareness

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • AsbestosAsbestos disturbance
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning / preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. Specify?

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

3 خطوات عمل أخرى، من Assess for the presence of asbestos إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على حزمة التوفير هذه

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذه الحزمة 15 بدلًا من 20.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $1,349.25 $1,799.00 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يتضمنه

  1. Asbestos Awareness

    SWMS · 4 خطوات عمل

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    يُباع أيضًا منفردًا
  2. Extension Ladder

    SOP · 7 أقسام

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    يُباع أيضًا منفردًا
  3. Painting and Decorating

    SWMS · 15 خطوات عمل

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    يُباع أيضًا منفردًا
  4. Roof Work

    SWMS · 14 خطوات عمل

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    يُباع أيضًا منفردًا
  5. Mobile Plant Working Near-Around

    SWMS · 8 خطوات عمل

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    يُباع أيضًا منفردًا
  6. Falls Emergency Rescue Plan

    خطة إدارة · 14 أقسام

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    يُباع أيضًا منفردًا
  7. Handheld Power Tools

    SOP · 9 أقسام

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    يُباع أيضًا منفردًا
  8. Trestle Scaffold

    SOP · 7 أقسام

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    يُباع أيضًا منفردًا
  9. High Pressure Water Cleaner

    SWMS · 10 خطوات عمل

    SWMS for high-pressure water jet cleaning: site set-up, hot water and steam, electric and fuel units, refuelling, hazardous materials and emergencies.

    يُباع أيضًا منفردًا
  10. Manual Handling

    SOP · 5 أقسام

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    يُباع أيضًا منفردًا
  11. Hazardous Chemicals

    SWMS · 12 خطوات عمل

    SWMS for hazardous chemicals work: purchasing, storage, labelling, handling, confined spaces, completion and emergency response.

    يُباع أيضًا منفردًا
  12. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 خطوات عمل

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    يُباع أيضًا منفردًا
  13. Platform Ladder

    SOP · 7 أقسام

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    يُباع أيضًا منفردًا
  14. Lead Paint Removal

    SWMS · 13 خطوات عمل

    SWMS for lead paint removal: health monitoring, site set-up, environmental protection, tools, hazardous substances, clean-up and emergencies.

    يُباع أيضًا منفردًا
  15. Hand Tools

    SOP · 9 أقسام

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    يُباع أيضًا منفردًا
  16. Cherry Picker

    SOP · 10 أقسام

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    يُباع أيضًا منفردًا
  17. Powered Non-powered Tools

    SWMS · 12 خطوات عمل

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    يُباع أيضًا منفردًا
  18. Scissor Lift

    SOP · 10 أقسام

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    يُباع أيضًا منفردًا
  19. Manual Handling

    SWMS · 18 خطوات عمل

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    يُباع أيضًا منفردًا
  20. Mobile Scaffolding

    SOP · 8 أقسام

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    يُباع أيضًا منفردًا

ما يغطيه

المخاطر التي يغطيها

التشريعات والمعايير التي يستند إليها

يأتي كل SWMS مع قائمة مراجع التشريعات ومدونات الممارسة الخاصة بنا.

ما توفّره

النموذجخطوات العملمنفردًا
Asbestos Awareness4$89.95 · رصيد واحد
Extension Ladder0$89.95 · رصيد واحد
Painting and Decorating15$89.95 · رصيد واحد
Roof Work14$89.95 · رصيد واحد
Mobile Plant Working Near-Around8$89.95 · رصيد واحد
Falls Emergency Rescue Plan0$89.95 · رصيد واحد
Handheld Power Tools0$89.95 · رصيد واحد
Trestle Scaffold0$89.95 · رصيد واحد
High Pressure Water Cleaner10$89.95 · رصيد واحد
Manual Handling0$89.95 · رصيد واحد
Hazardous Chemicals12$89.95 · رصيد واحد
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · رصيد واحد
Platform Ladder0$89.95 · رصيد واحد
Lead Paint Removal13$89.95 · رصيد واحد
Hand Tools0$89.95 · رصيد واحد
Cherry Picker0$89.95 · رصيد واحد
Powered Non-powered Tools12$89.95 · رصيد واحد
Scissor Lift0$89.95 · رصيد واحد
Manual Handling18$89.95 · رصيد واحد
Mobile Scaffolding0$89.95 · رصيد واحد
عند الشراء واحدًا تلو الآخر$1,799.00 · 20 أرصدة
ضمن هذه الحزمة$1,349.25 · 15 أرصدة توفّر $449.75

المراجعات

لا توجد مراجعات بعد.

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.