عرض الوصول المبكر:وصول مبكر: خصم 30%، ما دمت مشتركًا.

احصل على العرض

مستندات النماذج مكتوبة باللغة الإنجليزية.

جرّب المحرّر مجانًا

نظام · 117 مستنداتجزء من Transport & Warehousing Integrated Industry Suite

Electric Vehicle Battery Charging

SWMS · SWMS-10348

  • 6 خطوات عمل
  • النسخة 5

This Electric Vehicle Battery Charging Safe Work Method Statement (SWMS) outlines the safety steps, potential hazards and controls for managing the risks of repairing, servicing and charging electric vehicle batteries.

It covers 6 job steps: planning, training, battery storage, repair, maintenance, servicing and charging, battery disposal, and emergency response.

It includes controls for fire and explosion, hazardous chemicals including sulphuric acid, electric shock, spills and manual handling, and for high-risk construction work involving mobile plant and hazardous atmospheres.

It suits electric vehicle service technicians, workplace safety officers and construction project managers.

اعرض صفحته الخاصة

معاينة SWMS Electric Vehicle Battery Charging

Electric Vehicle Battery Charging

SWMSVersion 5
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Fire/ explosion; Hazardous chemicals – including sulphuric acid, lead; Hazardous atmosphere

      Before controls4 Acute
      Controls
      • Repair/charging area. Ensure:

        • The area has caution signs

        • Well ventilated (provide explosion-proof mechanical ventilation if required)

        • Protected from direct sunlight

        • Not located near flammable storages or other hazardous chemicals

        • Spill containment system in place

        • Adequate fire protection provided

        • Emergency shower and eyewash provided

        • No ignition sources within 6m; all electrical installations should be rated explosion-proof

        • Equipped with overhead hoists, conveyors or cranes for handling batteries

        • A clear pathway for Battery/Forklift travels from the storage/unloading area to the charging area.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Contact with electricity

      Before controls4 Acute
      Controls
      • Plant and equipment. Ensure:

        • All manufacturer’s /supplier’s instructions and user manuals are available

        • Electrical equipment installed by qualified electricians where necessary

        • Portable electrical equipment is connected, protection by an appropriate residual current device (RCD)

        • Seek the advice of a competent person for appropriate inspection and testing intervals of equipment

        • Clearly marking walkways and charging area.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

5 خطوات عمل أخرى، من Training إلى Emergency response

لكل منها مخاطرها وتقييمات خطورتها وإجراءات التحكم فيها، إضافة إلى توقيع طاقمك.

المعاينة بصيغة

كيف يبدو في المتصفح

احصل على هذا النظام

سجّل مجانًا، ثم اختر الطريقة التي تناسبك. يُضاف كل مستند إلى مكتبتك، في مجلد يحمل اسم الحزمة.

  • مشمول في الخطط المدفوعة

    استخدم أرصدة النماذج من خطتك. تكلفة هذا النموذج 20.

    قارن الخطط والأسعار
  • اشترِه مرة واحدة

    $999.90 تُدفع مرة واحدة، ويبقى ملكك. يعمل على الخطة المجانية أيضًا.

لا حاجة إلى بطاقة للتسجيل. يحصل أعضاء الوصول المبكر على خصم 30% على أي خطة.

ما يغطيه

6 خطوات عمل

  1. PlanningSet up the repair and charging area and its electrical equipment
  2. TrainingTrain and license workers who handle and charge batteries
  3. Battery storageStore batteries away from ignition sources and follow the SDS
  4. Repair, maintenance, servicing & charging of electric vehicle batteriesControl plant movement, acid, charging, spills and handling when servicing batteries
  5. Battery disposalDispose of and recycle batteries without incinerating them
  6. Emergency responseCall 000, follow emergency procedures and give first aid

المخاطر التي يغطيها

كيف تعمل النماذج

جرّبه قبل أن تدفع.

  1. معاينة مجانية

    خطوات العمل والمخاطر والمهمة الأولى في كل نموذج متاحة للقراءة. دون تسجيل.

  2. جرّب المحرّر

    كيّف بيان SWMS تجريبيًا باسم شركتك ومهمتك وموقعك، على الحاسوب أو هاتفك.

  3. سجّل مجانًا

    تنتقل بياناتك وشعارك معك. وهذا النموذج يُفتح معبّأً مسبقًا.

  4. استخدم رصيدًا أو اشترِ مرة واحدة

    تتضمن الخطط المدفوعة أرصدة نماذج كل شهر. أو اشترِ هذا النموذج ليبقى لك.