Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free

System · 96 documentsPart of Asbestos Removal OHS-WHS Industry Suite

Asbestos Removal Control Plan

Management plan · PLAN-20332

  • Version 4

The Asbestos Removal Control Plan can be used by those undertaking asbestos removal work. It is designed by industry experts to ensure that all asbestos removal processes are conducted safely and effectively.

It covers identifying asbestos containing materials, notifications, consultation, the emergency plan, site hazards, PPE and a site plan, then removal methods, air monitoring, waste disposal, equipment and enclosures, administrative controls and decontamination methods.

An asbestos removal checklist in nine sections puts the plan into practice, with space for comments and required actions.

See its own page

Preview of the Asbestos Removal Control Plan

Asbestos Removal Control Plan

Management planVersion 4

Introduction

The ARCP is to be completed and signed by the authorised person/s before work commences. A copy of this ARCP will be forwarded to the Contract Supervisor, along with any other relevant work permits. This ARCP must be available on-site at the worksite during the asbestos removal.

Prepared by
—
Date
—
Site Name
—
Site Address
—
Site Supervisor
—
Contact number
—
Start Date
—
Completion date
—

Asbestos Removal Contractor

Company Name:

Contractor Name:

Contact Number:

Licence Number:

Licence class:

  • Class A

  • Class B

Air Monitoring

Company Name:

Licence/Certification:

Clearance Inspection

Company Name:

Licence/Certification:

10 more sections

  1. Notifications
  2. Identification
  3. Preparation
  4. Emergency Plan
  5. Personal Protective Equipment (PPE)
  6. and 5 more

Written in full, ready for your business's details.

Preview as

How it reads in a browser

Get this system

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This one costs 20.

    Compare plans and prices
  • Buy it once

    $999.90 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

11 sections

  1. Notifications
  2. Identification
  3. Preparation
  4. Emergency Plan
  5. Personal Protective Equipment (PPE)
  6. Site Plan
  7. Removal
  8. Decontamination Methods
  9. Other risk control measures
  10. Asbestos Removal Checklist

Plus an introduction

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.