Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free

System · 113 documentsPart of Carpentry on Construction OHS-WHS Industry Suite

V Cut Mitre Saw

SOP · SOP-60012

  • Version 4

The V Cut Mitre Saw Safe Operating Procedure (SOP) gives clear, step-by-step instructions for operating a V cut mitre saw safely and reducing the risks that come with it.

It covers the hazards (noise, electricity, blades, moving parts, manual handling and poor housekeeping), the PPE to wear, operator training, the pre-operational inspection, blade replacement, step-by-step operation, maintenance and shutdown.

A hazard checklist for powered non-mobile plant, with Y, N and NA for each item, helps confirm every safety measure is in place.

See its own page

Preview of the V Cut Mitre Saw SOP

V Cut Mitre Saw

SOPVersion 4

Acronyms

  • LOTO - Lockout/Tagout.

  • PPE - Personal Protective Equipment.

  • SOP - Safe Operating Procedure.

  • SDS – Safety Data Sheet.

Hazards

What can cause harm?

  • Noise

  • Electricity

  • Blades

  • Moving parts

  • Manual Handling

  • Poor housekeeping

Personal protective equipment

  • Foot Protection
  • Hearing Protection

Pre-operational inspection

Mitre saw with blade guard, rotating scale and clamps
  • Follow the pre-operational checklist in the manufacturer’s operational manual, ensure:

    • The correct blade has been selected & installed

    • The blade is secured, sharp and turns freely

    • All guards are in position, are in good working order

    • All keys and adjusting wrenches are removed from the saw.

Blade replacement

  • Replace cracked, chipped, or damaged blades immediately

5 more sections, from Precautions to Hazard checklist (powered non-mobile plant)

Written in full, ready for your business's details.

Preview as

How it reads in a browser

Get this system

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This one costs 20.

    Compare plans and prices
  • Buy it once

    $999.90 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

10 sections

  1. Hazards
  2. Personal protective equipment
  3. Pre-operational inspection
  4. Blade replacement
  5. Precautions
  6. Operation
  7. Maintenance
  8. Shutdown / after use
  9. Hazard checklist (powered non-mobile plant)

Plus definitions

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.