Asbestos toolbox talk

Read it out at the pre-start or a toolbox meeting, talk through the questions, and have everyone sign on. It's built from our asbestos page and the 208 SafetyDocs templates that cover it.

Site
Date
Presented by

What it is

Asbestos-containing material in roofs, eaves, linings or other parts of a building that can release fibres when drilled, cut or otherwise disturbed.

Controls to check, most effective first

  1. Check the asbestos register and any asbestos survey before work, and treat unidentified suspect material as asbestos until tested.
  2. Redesign the job to avoid disturbing asbestos-containing material, or have it removed by a licensed asbestos removalist before work starts.
  3. Do not use high-pressure water, compressed air, power tools or brooms in ways that release asbestos fibres into the air.
  4. Stop work immediately if suspected asbestos is uncovered, isolate the area and notify the person in control of the workplace.
  5. Wear disposable coveralls and a properly fitted P2 or higher respirator, and decontaminate before leaving the work area.
  6. Wrap and label asbestos waste in heavy-duty plastic and dispose of it only at a facility approved to accept it.

Where it comes up on the job

Work steps from SafetyDocs templates that deal with asbestos:

Questions for the crew

  1. Where could asbestos come up on this job today?
  2. Is any of this work on today's job: Collection & disposing of asbestos waste; Working with asbestos (Examples only); Working with powered & non-powered tools on asbestos?
  3. The most effective control is: “Check the asbestos register and any asbestos survey before work, and treat unidentified suspect material as asbestos until tested”. Can we do that here? If not, why not?
  4. Which controls for asbestos are missing or not working on this site?
  5. When would you stop work because of asbestos, and who would you tell?
  6. How do we report a hazard, a near miss or an incident on this job?

Sign-on record

Everyone who attended signs below. Keep it with your toolbox talk records.

NameCompanySignature

A starting point for a talk, not a SWMS or a risk assessment. Add what's particular to your site and crew.