Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer

Electromagnetic energy toolbox talk

Read it out at the pre-start or a toolbox meeting, talk through the questions, and have everyone sign on. It's built from our electromagnetic energy page and the 16 SafetyDocs templates that cover it.

Site
Date
Presented by

What it is

Radio-frequency and other electromagnetic energy from antennas, transmitters and similar equipment that can cause burns or heating of the body.

Controls to check, most effective first

  1. Identify the sources of electromagnetic energy and the exclusion zones around each antenna or transmitter, using the operator's site information.
  2. Ask the carrier or operator to power down or reduce the transmitter before work in its exclusion zone.
  3. Use a personal RF monitor to warn when levels are above safe limits, and keep it on while working near antennas.
  4. Mark the exclusion zones with signs and barriers, and keep other people outside them.
  5. Plan the work to limit the time spent near the antenna, and keep clear of its front-on beam.
  6. Train workers to read the site signs and the warning from the monitor, and to leave the area at once when it alarms.

Where it comes up on the job

Work steps from SafetyDocs templates that deal with electromagnetic energy:

Questions for the crew

  1. Where could electromagnetic energy come up on this job today?
  2. The most effective control is: “Identify the sources of electromagnetic energy and the exclusion zones around each antenna or transmitter, using the operator's site information”. Can we do that here? If not, why not?
  3. Which controls for electromagnetic energy are missing or not working on this site?
  4. When would you stop work because of electromagnetic energy, and who would you tell?
  5. How do we report a hazard, a near miss or an incident on this job?

Sign-on record

Everyone who attended signs below. Keep it with your toolbox talk records.

NameCompanySignature

A starting point for a talk, not a SWMS or a risk assessment. Add what's particular to your site and crew.