Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Prueba el editor gratis

Fuel Tank Maintenance Non-entry

SWMS · SWMS-10635

Vista previa de la plantilla SWMS Fuel Tank Maintenance Non-entry
  • 14 pasos del trabajo
  • Versión 2
  • Miscellaneous
  • Se lee en cualquier teléfono

This SWMS outlines the hazards and controls for maintaining fuel tanks without entering them. It is essential for ensuring safe operations in potentially hazardous environments.

It takes your crew through each job step, from planning, arriving on site and setting up the work area to pumping fuel from the tank, purging it, welding and pressure testing the sockets, cutting out the socket with a hole saw, completion and emergency response.

It suits safety officers and managers overseeing fuel storage facilities, maintenance teams tasked with fuel tank upkeep, and contractors and subcontractors engaged in fuel system services.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Vista previa de SWMS Fuel Tank Maintenance Non-entry

Fuel Tank Maintenance Non-entry

SWMSVersion 2

Document details

Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training.

    • Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Face Protection
  • Hand Protection
  • Protective Clothing

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Environmental harm

      Before controls4 Acute
      Controls
      • Implement a Fuel Spill Emergency Response Plan

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Fire and explosion

      Before controls4 Acute
      Controls
      • Implement a Fuel Spill Emergency Response Plan

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

13 pasos más del trabajo, de Check weather conditions & prepare a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue esta plantilla

Regístrate gratis y luego elige cómo lo quieres. Los datos de tu empresa se rellenan solos.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Esta cuesta 1.

    Comparar planes y precios
  • Cómprala una sola vez

    $89.95 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué cubre

14 pasos del trabajo

  1. PlanningPlan the work and the fuel spill response
  2. Check weather conditions & prepareCheck the weather and reschedule work in extreme conditions
  3. Arrival on-site & assess onsite conditionsCheck the site and assess its conditions
  4. Work area set-upSecure the work area and keep unauthorised people out
  5. EnvironmentReduce noise, waste, spill and vehicle impacts on the environment
  6. House keepingKeep the work area clean and clear of trip hazards
  7. Manual tasksPlan manual tasks to prevent musculoskeletal injuries
  8. Hazardous substance /chemical useHandle and use hazardous chemicals safely
  9. Pump fuel from the tankPump the fuel out of the tank safely and respond to spills
  10. Purge the tankPurge the tank with nitrogen and test for fuel vapours
  11. Weld and pressure test sockets on the tankWeld and pressure test the sockets safely
  12. Cut out the inside of the socket using a hole sawCut out the socket with a hole saw using safe electrical practice
  13. On completionShut down, disconnect and sign out
  14. Emergency responseCall for help, control the area and report the incident

Peligros que cubre

Opiniones

Todavía no hay opiniones.

Ver todo

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.