Hot Jet Street Cleaner

SWMS · SWMS-10559

Vista previa de la plantilla SWMS Hot Jet Street Cleaner
  • 11 pasos del trabajo
  • Versión 3
  • Cleaning
  • Se lee en cualquier teléfono

This Hot Jet Street Cleaner Safe Work Method Statement (SWMS) outlines the general job steps, hazards and controls when operating a hot jet street cleaner.

It covers 11 job steps: working alone, arrival at site, vehicle operation and cleaning, operating the wand jet, obtaining water from a hydrant, environment, housekeeping, manual tasks, refuelling, on completion and emergency response.

It includes controls for hazards such as traffic, pedestrians, mobile plant, hot water under pressure, asbestos and lead disturbance, noise and fire.

It suits businesses and contractors involved in street cleaning operations, particularly those using hot jet street cleaners.

Vista previa de SWMS Hot Jet Street Cleaner

Hot Jet Street Cleaner

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training.

  • Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Working alone

    • Hazard

      Emergency

      Before controls4 Acute
      Controls
      • Ensure a second person knows your location and expected time of return

      • Use mobile phone, telephone or radio to periodically check-in

      • Communication equipment within easy reach at all times

      • Take extra care to work safely and methodically

      • Have a first aid kit readily available and stocked appropriately

      After controls2 Moderate
      Responsible
      • Operatorto maintain call logins

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

10 pasos más del trabajo, de Arrival at site a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue esta plantilla

Regístrate gratis y luego elige cómo lo quieres. Los datos de tu empresa se rellenan solos.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Esta cuesta 1.

    Comparar planes y precios
  • Cómprala una sola vez

    $89.95 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué cubre

11 pasos del trabajo

  1. Working aloneWork safely when alone
  2. Arrival at siteDo the initial safety checks and assess the site
  3. Vehicle operation & cleaningOperate the vehicle and clean safely
  4. Operating the wand jetUse the jetting wand safely
  5. Obtaining water from a hydrantGet water from hydrants safely
  6. EnvironmentProtect the environment while cleaning
  7. House keepingKeep the site clean and tidy
  8. Manual tasksManage manual tasks to prevent injury
  9. RefuellingRefuel safely to avoid fire
  10. On completionFinish operations safely
  11. Emergency responseRespond to emergencies

Peligros que cubre

Opiniones

Todavía no hay opiniones.

Ver todo

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.