Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Side Lifter-Articulated Truck

SWMS · SWMS-10647

Vista previa de la plantilla SWMS Side Lifter-Articulated Truck
  • 12 pasos del trabajo
  • Comprado 40 veces
  • Versión 3
  • Earthmoving & Mobile Plant
  • Se lee en cualquier teléfono

This Safe Work Method Statement covers the hazards and controls for operating a side lifter articulated truck. It runs from planning the route and permits through vehicle operation, transporting the load and arriving at site to loading and unloading containers.

It takes your crew through 12 job steps, including working near overhead electric lines, housekeeping, manual tasks, environmental impact, refuelling, completion and emergency response.

It suits transport companies, construction project managers, logistics and warehouse supervisors, and safety officers and compliance managers working with side lifter trucks in the construction and logistics sectors.

Vista previa de SWMS Side Lifter-Articulated Truck

Side Lifter-Articulated Truck

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Business phone
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile Plant
  • Gas Mains
  • Hazardous Lines
  • Energised Electrical
  • Hazardous Atmosphere

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Hand Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Unplanned route; unpermitted travel

      Before controls4 Acute
      Controls
      • Plan all driving routes as per State requirements for the size of the load

      • Permitted travel routes travel times/curfews as required

      • Ensure travel path will not damage utilities (gas, telecommunication, electrical, water or sewerage systems), or bridges, rail, or other property

      • Ensure drivers/offsiders fully briefed on the day's work requirements

      • Special provisions, certifications/permits required for oversize loads (check state authority for details)

      • In the absence of load checking and warning devices, ensure operators are trained to recognise acceptable loads.

      After controls2 Moderate
      Responsible
      • Supervisorto maintain awareness of weather conditions
      • Operatorto follow controls

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

11 pasos más del trabajo, de Working alone a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue esta plantilla

Regístrate gratis y luego elige cómo lo quieres. Los datos de tu empresa se rellenan solos.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Esta cuesta 1.

    Comparar planes y precios
  • Cómprala una sola vez

    $89.95 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué cubre

12 pasos del trabajo

  1. PlanningPlan the route and check permits
  2. Working aloneLet someone know where you are and check in
  3. Vehicle operation & transporting the loadInspect the truck, manage fatigue and transport the load
  4. Arriving at siteFollow the traffic management plan and park safely
  5. Working near overhead electric linesKeep clear of overhead electric lines
  6. House keepingKeep the work area clean and clear
  7. Manual tasksAvoid awkward postures and take regular breaks
  8. Pick-up/set-down loadLoad and unload on stable ground and keep ground workers clear
  9. EnvironmentLimit noise, dust, waste and fuel spills
  10. RefuellingRefuel to the manual with no smoking and the right extinguisher
  11. On completionSecure the truck and sign everyone out
  12. Emergency responseCall 000, give first aid and complete an incident report

Peligros que cubre

Opiniones

Todavía no hay opiniones.

Ver todo

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.