Low Loader SWMS टेम्पलेट का पूर्वावलोकन
  • काम के 11 चरण
  • 198 बार ख़रीदा गया
  • संस्करण 7
  • Transport & Warehousing
  • किसी भी फ़ोन पर पढ़ें

This Low Loader Safe Work Method Statement (SWMS) covers hazards and controls associated with the movement of plant (referred to as the load) using a low loader transport vehicle.

It covers 11 job steps: planning, working alone, coupling and uncoupling the low loader, vehicle operation, pick up and set down of the load, environment, housekeeping, manual tasks, refuelling, on completion and general emergency response.

It includes controls for mobile plant movement and for work carried out adjacent to roads, railways or shipping lanes and in traffic corridors.

It suits businesses in construction, logistics and any operation that uses a low loader transport vehicle, including safety officers, site supervisors and operators.

Low Loader SWMS का प्रीव्यू

Low Loader

SWMSVersion 7
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column):

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous Lineschemical, fuel or refrigerant lines
  • Energised Electricalenergised electrical installations or services
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Hand Protection
  • Sun Protection
  • Seat Belt

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Unplan route; Unpermitted travel

      Before controls4 Acute
      Controls
      • Plan all driving routes as per State requirements for the size of the load

      • Permitted travel routes travel times/curfews as required

      • Ensure travel path will not damage utilities (gas, telecommunication, electrical, water or sewerage systems), or bridges, rail, or other property

      • Ensure drivers/offsiders fully briefed on the day's work requirements

      • In the absence of load-checking and warning devices, ensure operators are trained to recognise acceptable load distributions

      • Special provisions, certifications/permits and SWMS required for oversize loads (check state authority for details)

      • In the absence of load checking and warning devices, ensure operators are trained to recognise acceptable loads.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

काम के 10 और चरण, Working alone से Emergency response तक

हर एक में उसके ख़तरे, जोखिम रेटिंग और नियंत्रण, और साथ में आपके क्रू का साइन-ऑन।

ऐसे प्रीव्यू करें

ब्राउज़र में यह कैसा दिखता है

यह टेम्पलेट पाएँ

मुफ़्त में साइन अप करें, फिर चुनें कि आप इसे कैसे लेना चाहते हैं। आपकी कंपनी की जानकारी अपने आप भर जाती है।

  • पेड प्लान में शामिल

    अपने प्लान के टेम्पलेट क्रेडिट इस्तेमाल करें। इसकी कीमत 1 है।

    प्लान और कीमतों की तुलना करें
  • एक बार ख़रीदें

    $89.95 एक बार का भुगतान, और यह हमेशा आपका रहेगा। मुफ़्त प्लान पर भी चलता है।

साइन अप के लिए कार्ड नहीं चाहिए। अर्ली एक्सेस सदस्यों को किसी भी प्लान पर 30% की छूट मिलती है।

इसमें क्या-क्या है

काम के 11 चरण

  1. PlanningPlan and permit the route for the load and brief the drivers
  2. Working aloneKeep in contact and carry a first aid kit when working alone
  3. Coupling/uncoupling the low-loaderCouple and uncouple the truck and trailer and chock the wheels
  4. Vehicle operationInspect the truck, mount it safely and drive it safely
  5. Pick up/set down of loadArrive on site, then load, secure and unload the plant
  6. EnvironmentControl noise, waste, fuel and other environmental impacts
  7. House keepingKeep the work area clean and clear of trip hazards
  8. Manual tasksManage fatigue, rest breaks and strain from tie-downs
  9. RefuellingRefuel away from ignition sources with an extinguisher on hand
  10. On completionPark and secure the truck, inspect it and sign out
  11. Emergency responseRespond to an injury, fire or roll-over

इसमें शामिल ख़तरे

रिव्यू

अभी कोई रिव्यू नहीं।

सब देखें

टेम्पलेट कैसे काम करते हैं

आज़माएँ, पैसे देने से पहले।

  1. मुफ़्त प्रीव्यू

    हर टेम्पलेट के काम के चरण, ख़तरे और पहला काम पढ़ने के लिए खुले हैं। साइन अप की ज़रूरत नहीं।

  2. एडिटर आज़माएँ

    कंप्यूटर या अपने फ़ोन पर, एक डेमो SWMS को अपनी कंपनी, जॉब और साइट के हिसाब से ढालें।

  3. मुफ़्त में साइन अप करें

    आपकी जानकारी और लोगो साथ आ जाते हैं। यह टेम्पलेट पहले से भरा हुआ खुलता है।

  4. क्रेडिट इस्तेमाल करें या एक बार ख़रीदें

    पेड प्लान में हर महीने टेम्पलेट क्रेडिट मिलते हैं। या यह टेम्पलेट हमेशा के लिए ख़रीद लें।