Road Safety Barrier Installation

SWMS · SWMS-10658

  • 작업 단계 21개
  • 버전 4

This Road Safety Barrier Installation Safe Work Method Statement (SWMS) covers the hazards and controls associated with the installation of road safety barriers.

It takes the crew through 21 job steps: training on the health effects of respirable crystalline silica (RCS), planning, checking the weather, arriving on site, setting up the work zone, environment, housekeeping, manual tasks, materials delivery, mobile plant, powered and non-powered tools, hazardous substances and chemicals, driving posts, changing attachments, posthole excavation, concrete placement, cutting the road surface, rail installation, refuelling, completion and emergency response.

It includes controls for high-risk construction work, additional controls for electrical equipment, slips, trips and falls, and hazardous substances.

It suits businesses and contractors installing road safety barriers, to help them meet their WHS obligations.

개별 페이지 보기

Road Safety Barrier Installation SWMS 미리 보기

Road Safety Barrier Installation

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantWork in an area where there is any movement of powered mobile plant
  • Gas MainsWork on or near pressurised gas distribution mains or piping
  • Hazardous LinesWork on or near chemical, fuel or refrigerant lines
  • Energised ElectricalWork on or near energised electrical installations or services
  • Traffic CorridorsWork on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 20개 더: Planning부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 시스템 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 템플릿은 20입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $999.90 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

다루는 내용

작업 단계 21개

  1. Provide training on the health effects associated with RCSTrain workers on the health effects of respirable crystalline silica (RCS).
  2. PlanningDevelop a Traffic Management Plan and identify underground services.
  3. Check weather conditions & prepareCheck the weather conditions and environmental considerations.
  4. Arrival on-site & assess onsite conditionsCheck the worksite matches the contract terms and identify unanticipated hazards.
  5. Establish safe work zone (site set-up)Set up a safe work zone and communication protocols.
  6. EnvironmentManage environmental impacts, including noise, air quality and waste.
  7. House keepingKeep the work area clean and safe to prevent slips, trips and falls.
  8. Manual tasksPrevent musculoskeletal disorder (MSD) injuries.
  9. Materials deliveryDeliver materials safely to avoid accidents.
  10. Mobile plant delivery, set-up & removalHandle and operate mobile plant safely.
  11. Working with powered & non-powered toolsPrevent electrocution, injury, fire and asphyxiation.
  12. Hazardous substance /chemical useManage the risks of hazardous substances and chemicals.
  13. Driving postsOperate post-driving equipment safely.
  14. Changing attachmentsChange equipment attachments safely.
  15. Posthole excavation using an excavatorMake sure only licensed operators carry out excavation work.
  16. Concrete placementManage the risks of handling wet cement.
  17. Cutting road surface (concrete/bitumen)Control silica dust exposure during cutting.
  18. Rail installationManage fire safety and the handling of materials.
  19. Fuelling onsiteManage the risks of refuelling on site.
  20. On completionSecure the site and keep it safe after the work is complete.
  21. Emergency responseRespond to emergencies.

다루는 위험 요소

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.