Shipping Container Unloading

SWMS · SWMS-10226

  • 작업 단계 10개
  • 버전 2

This SWMS covers the safe and efficient unloading of goods and equipment from inside shipping containers. It sets out the hazards and controls for the unique risks of container unloading, to protect your workers and comply with Australian regulations.

It takes your crew through each step, from work area set-up and environmental considerations to opening containers, forklift operation, pallet jacks and trolleys, unpacking sheet material, completion, and emergency response. Forklift operation and completion are marked as high-risk construction work.

It suits businesses and workers in the logistics, construction and warehousing sectors, particularly those responsible for unloading shipping containers.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

개별 페이지 보기

Shipping Container Unloading SWMS 미리 보기

Shipping Container Unloading

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the construction project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work.

(specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended, if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Seat Belt

Job steps, hazards and controls

  • Work activityHRCW

    Work area set-up

    • Hazard

      Container placement

      Before controls3 High
      Controls
      • Set containers on flat area to prevent rollover and content shifts.

      • Prioritise secure locations for container placement; use barriers and signage to limit access if security isn't achievable.

      • Ensure ample space for unpacking activities.

      • Keep the container away from overhead electric wires.

      After controls2 Moderate
      Responsible
      • Operatorto ensure control measures followed
    • Hazard

      Traffic/public access

      Before controls3 High
      Controls
      • If loading/unloading/setting-up roadside – comply with local laws and permits

      • Barricading controls are implemented and authorised as part of the safe work system to protect people from hazards

      • Establish exclusion zones to stop people from entering the area

      • Signage in place to caution people not to enter

      • Public footpath or roadway exclusion zone:

        • Seek approval from the relevant authority; safely direct people to an alternative footpath where required

        • Lane closures and other operations requiring barricades and signs must meet local road traffic authority, local government authorities' requirements

      • Use a spotter as required - designate a responsible person for controlling the immediate area where the operation is occurring

      • Responsible person to authorise entry into the area

      • The barricade must be far enough to keep observers safe.

      After controls2 Moderate
      Responsible
      • Operatorto ensure control measures followed

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 9개 더: Environment부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 6 대신 5입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $449.75 $539.70 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

다루는 내용

작업 단계 10개

  1. Work area set-upPlace the container safely and control access
  2. EnvironmentManage noise, spills and weather
  3. House keepingKeep the work area clean and free of slip and trip hazards
  4. Manual tasksReduce the strain of manual tasks
  5. Opening containersOpen the container doors safely and manage chemical exposure
  6. Forklift operationOperate the forklift safely around pedestrians
  7. Using pallet jacks and trolleysUse pallet jacks and trolleys without dropping or striking
  8. Unpacking sheet materialUnpack sheet material securely
  9. On completionMake equipment safe, clean up and secure the container
  10. Emergency responseRespond to injuries and emergencies

다루는 위험 요소

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.