얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

Gas-Water Leak Detection

SWMS · SWMS-10473

Gas-Water Leak Detection SWMS 템플릿 미리보기
  • 작업 단계 17개
  • 67회 구매됨
  • 버전 3
  • Plumbing
  • 어떤 휴대폰에서든 읽기 가능

This Gas-Water Leak Detection Safe Work Method Statement (SWMS) outlines the safety measures needed for dealing with hazards during leak detection for gas and water systems.

It covers 17 job steps, from training, planning and weather checks to cylinder handling and transport, work area set-up, manual tasks, tools, working at height, pre-operational inspection, gas and water leak detection and repair, shallow diving, completion and emergency response.

It includes controls for specialised equipment such as gas cylinders and detection tools, and for protecting the environment.

It suits gas and water utility companies, maintenance and repair contractors, facility management services, and safety officers and compliance teams.

Gas-Water Leak Detection SWMS 미리 보기

Gas-Water Leak Detection

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas MainsWork on or near pressurised gas distribution mains or piping
  • Hazardous LinesWork on or near chemical, fuel or refrigerant lines
  • Energised ElectricalWork on or near energised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Water & DrowningIn or near water or other liquid that involves the risk of drowning

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e.,, no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-Specific Notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Eye Protection
  • Hand Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Drowning; Impact injuries; Infection

      Before controls3 High
      Controls
      • This SWMS must not be used for controls associated with Supplied Air Dive System

      • Use additional SWMS with specific controls related to diving systems

      • Ensure formally trained Cardio-Pulmonary Resuscitation (CPR) first aiders on-site at all times

      • All workers are to be trained in emergency and rescue procedures and use of emergency/rescue equipment

      • Provide training for all workers on the risks, prevention, first aid and need for treatment of waterborne diseases

      • Operators are:

        • Physically capable of undertaking the work required

        • Physically able to swim or tread water for maximum emergency response time.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 16개 더: Planning부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 템플릿 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 회사 정보는 자동으로 채워집니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 템플릿은 1입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $89.95 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

다루는 내용

작업 단계 17개

  1. TrainingTrain workers in the hazards, first aid and emergency rescue for the job
  2. PlanningCheck work permits and follow their precautions
  3. Check weather conditions & prepareCheck the weather and reschedule work in extreme conditions
  4. Cylinder handling & transportStore, handle and transport gas cylinders safely
  5. Arrival on-site & assess onsite conditionsReport to the supervisor, get inducted and check site conditions on arrival
  6. Work area set-upSet up the work area and control access, electricity, hazardous substances and gases
  7. EnvironmentManage waste, fuels, vehicles and animals to protect the environment
  8. House keepingKeep the work area clean and clear to prevent slips and trips
  9. Manual tasksPlan lifts and use team lifts or trolleys to prevent manual task injuries
  10. Working with powered & non-powered toolsUse powered and non-powered tools safely to prevent shock, injury and fire
  11. Working at height on ladders &/or mobile scaffoldUse ladders and mobile scaffold safely to prevent falls and falling objects
  12. Pre-operational inspectionInspect inert gas cylinders and gas detecting equipment before use
  13. Gas leak detection & repairDetect and repair gas leaks, controlling fire, equipment and chemical hazards
  14. Water leak detection & repairTest lines under pressure and use dye test kits safely
  15. Shallow diving – free air and snorkellingCheck the water and use a dive buddy for shallow diving
  16. On completionDismantle scaffold, secure cylinders and clean up before leaving
  17. Emergency responseCall 000, make the area safe and report the incident

다루는 위험 요소

리뷰

아직 리뷰가 없습니다.

모두 보기

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.