얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

에디터 무료로 써 보기
알뜰 팩 · 템플릿 20개

Painting and Decorating Combo

알뜰 팩 · PACK-50344

Painting and Decorating Combo 알뜰 팩 템플릿 미리보기
  • 템플릿 20개
  • 15 가격에 20개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of ten SWMS, nine SOPs and one plan for painters and decorators.

The SWMS cover painting and decorating, lead paint removal, high pressure water cleaning, hazardous chemicals, roof work and asbestos awareness. The SOPs include Mobile Scaffolding, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 15 template credits instead of 20.

Asbestos Awareness SWMS 미리 보기

Asbestos Awareness

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • AsbestosAsbestos disturbance
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning / preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. Specify?

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 3개 더: Assess for the presence of asbestos부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 20 대신 15입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $1,349.25 $1,799.00 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Asbestos Awareness

    SWMS · 작업 단계 4개

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    단독으로도 판매
  2. Extension Ladder

    SOP · 섹션 7개

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    단독으로도 판매
  3. Painting and Decorating

    SWMS · 작업 단계 15개

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    단독으로도 판매
  4. Roof Work

    SWMS · 작업 단계 14개

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    단독으로도 판매
  5. Mobile Plant Working Near-Around

    SWMS · 작업 단계 8개

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    단독으로도 판매
  6. Falls Emergency Rescue Plan

    관리 계획서 · 섹션 14개

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    단독으로도 판매
  7. Handheld Power Tools

    SOP · 섹션 9개

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    단독으로도 판매
  8. Trestle Scaffold

    SOP · 섹션 7개

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    단독으로도 판매
  9. High Pressure Water Cleaner

    SWMS · 작업 단계 10개

    SWMS for high-pressure water jet cleaning: site set-up, hot water and steam, electric and fuel units, refuelling, hazardous materials and emergencies.

    단독으로도 판매
  10. Manual Handling

    SOP · 섹션 5개

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    단독으로도 판매
  11. Hazardous Chemicals

    SWMS · 작업 단계 12개

    SWMS for hazardous chemicals work: purchasing, storage, labelling, handling, confined spaces, completion and emergency response.

    단독으로도 판매
  12. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 작업 단계 12개

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    단독으로도 판매
  13. Platform Ladder

    SOP · 섹션 7개

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    단독으로도 판매
  14. Lead Paint Removal

    SWMS · 작업 단계 13개

    SWMS for lead paint removal: health monitoring, site set-up, environmental protection, tools, hazardous substances, clean-up and emergencies.

    단독으로도 판매
  15. Hand Tools

    SOP · 섹션 9개

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    단독으로도 판매
  16. Cherry Picker

    SOP · 섹션 10개

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    단독으로도 판매
  17. Powered Non-powered Tools

    SWMS · 작업 단계 12개

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    단독으로도 판매
  18. Scissor Lift

    SOP · 섹션 10개

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    단독으로도 판매
  19. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  20. Mobile Scaffolding

    SOP · 섹션 8개

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Asbestos Awareness4$89.95 · 1크레딧
Extension Ladder0$89.95 · 1크레딧
Painting and Decorating15$89.95 · 1크레딧
Roof Work14$89.95 · 1크레딧
Mobile Plant Working Near-Around8$89.95 · 1크레딧
Falls Emergency Rescue Plan0$89.95 · 1크레딧
Handheld Power Tools0$89.95 · 1크레딧
Trestle Scaffold0$89.95 · 1크레딧
High Pressure Water Cleaner10$89.95 · 1크레딧
Manual Handling0$89.95 · 1크레딧
Hazardous Chemicals12$89.95 · 1크레딧
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1크레딧
Platform Ladder0$89.95 · 1크레딧
Lead Paint Removal13$89.95 · 1크레딧
Hand Tools0$89.95 · 1크레딧
Cherry Picker0$89.95 · 1크레딧
Powered Non-powered Tools12$89.95 · 1크레딧
Scissor Lift0$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Mobile Scaffolding0$89.95 · 1크레딧
하나씩 구매 시$1,799.00 · 20크레딧
이 팩으로 구매 시$1,349.25 · 15크레딧 $449.75 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.