Aluminium Window Door Frame Installation

SWMS · SWMS-10169

  • 작업 단계 15개
  • 버전 7

This Aluminium Window Door Frame Installation Safe Work Method Statement (SWMS) is designed to ensure safe and efficient handling, movement, and installation of aluminium window and door frames, incorporating necessary protocols and hazard controls.

It takes your crew through each job step, from health training on respirable crystalline silica dust, working outdoors and arriving on site to work area set-up, working at heights, cutting and joining aluminium, positioning, levelling and fixing frames, completion and emergency response.

It addresses all the risks of installing aluminium window and door frames, from manual handling to working at heights, and includes the latest guidelines for managing silica dust and for reducing environmental impact during installation.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

개별 페이지 보기

Aluminium Window Door Frame Installation SWMS 미리 보기

Aluminium Window Door Frame Installation

SWMSVersion 7
Company doing the work
[Company]
Business contact
—
Business contact phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person’s phone
—
Responsible person’s signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add notes specific to this site)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls4 Acute
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 14개 더: Check weather conditions & prepare부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 시스템 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 템플릿은 20입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $999.90 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

다루는 내용

작업 단계 15개

  1. Provide training on the health effects associated with RCSTrain workers on the health effects of respirable crystalline silica
  2. Check weather conditions & prepareCheck the weather and do not work in extreme conditions
  3. Arrival on-site & assess onsite conditionsPark safely, report to the site supervisor and check site conditions
  4. Work area set-upSet up an exclusion zone and barricade the drop zone
  5. EnvironmentControl noise, dust, waste, fuels and chemicals on site
  6. House keepingKeep the work area clean and free of trip hazards
  7. Manual tasksLift and carry materials safely
  8. Materials deliveryBarricade the delivery area, protect the public and locate services
  9. Working with powered & non-powered toolsInspect and use powered and non-powered tools safely
  10. Hazardous substance /chemical useUse hazardous substances as their SDS directs
  11. Working at height on ladders, trestles, mobile scaffold, fixed scaffold & openingsSet up and use ladders, trestles and scaffolds safely and protect openings
  12. Cutting & joining aluminiumCut aluminium with the saw’s guards in place
  13. Positioning, levelling & fixing framesLift, position and brace frames as a team, and control silica dust
  14. On completionRemove barricades, dismantle the scaffold, clean up and sign out
  15. Emergency responseFollow site emergency procedures and call 000

다루는 위험 요소

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.