Eight SWMS for tilers and waterproofers: tiling, waterproofing, floor bedding and screeding, tile sealing, grouting and patching and silica dust.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost six template credits instead of eight.

Bedding-Screeding Floor SWMS 미리 보기

Bedding-Screeding Floor

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-Risk Construction Work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

None listed.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Eye Protection
  • Hand Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 11개 더: Check weather conditions & prepare부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 8 대신 6입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $539.70 $719.60 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Bedding-Screeding Floor

    SWMS · 작업 단계 12개

    Hazards and controls for applying cement-sand screed to prepare floors before laying ceramic tiles or other floor coverings.

    단독으로도 판매
  2. Silica Dust

    SWMS · 작업 단계 14개

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    단독으로도 판매
  3. Tile Sealing

    SWMS · 작업 단계 10개

    Tile Sealing SWMS covering hazards and controls for sealing tiles, from weather checks and set-up to ladder work and emergencies.

    단독으로도 판매
  4. Powered Non-powered Tools

    SWMS · 작업 단계 12개

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    단독으로도 판매
  5. Caulking Grouting Patching

    SWMS · 작업 단계 12개

    SWMS for caulking, grouting and patching concrete panels, block and brick work, paving tiles and other building components.

    단독으로도 판매
  6. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  7. Tiling

    SWMS · 작업 단계 14개

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    단독으로도 판매
  8. Waterproofing

    SWMS · 작업 단계 12개

    SWMS for waterproofing internal wet areas, balconies and rooftops: site set-up, tools, working at height, membranes and torch-on work.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Bedding-Screeding Floor12$89.95 · 1크레딧
Silica Dust14$89.95 · 1크레딧
Tile Sealing10$89.95 · 1크레딧
Powered Non-powered Tools12$89.95 · 1크레딧
Caulking Grouting Patching12$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Tiling14$89.95 · 1크레딧
Waterproofing12$89.95 · 1크레딧
하나씩 구매 시$719.60 · 8크레딧
이 팩으로 구매 시$539.70 · 6크레딧 $179.90 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.