Floating Floor Laying

SWMS · SWMS-10606

  • कामका 14 चरण
  • संस्करण 3

This Floating Floor Laying SWMS sets out the safe installation of floating flooring. It covers the hazards and control measures for the safety of workers, particularly in high-risk construction environments.

It sets out 14 job steps, from out-of-hours work, working alone and arrival on site through work area set-up, materials delivery by truck, the environment, housekeeping, tools, concrete floor preparation, cutting and laying underlay, laying the floating floor and using adhesives, to completion and emergency response.

It has the SWMS sign-off table for workers and the risk matrix.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

यसको आफ्नै पृष्ठ हेर्नुहोस्

Floating Floor Laying SWMS को पूर्वावलोकन

Floating Floor Laying

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Mobile Plant

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Out-of-hours / night work

    • Hazard

      Fatigue; unauthorised access

      Before controls3 High
      Controls
      • Allow adequate meal breaks for workers; particularly if they have worked during part of the day, Allow time to rest & recover sufficiently to work safely into the evening/night

      • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

      • Workers have access to:

        • Suitable amenities (toilets/wash facilities/drinking water)

        • Sufficient lighting (including parking areas)

        • Air conditioning and heating

        • Mechanical ventilation if required

        • Emergency exits

        • Safe area for parking/unloading equipment – protected from rain

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

      • Ensure that adequate lighting is available

      • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

कामका थप 13 चरण, Working alone देखि Emergency response सम्म

हरेकमा खतरा, जोखिम रेटिङ र नियन्त्रण, साथै तपाईंको टोलीको साइन-अन।

यसरी पूर्वावलोकन गर्नुहोस्

ब्राउजरमा यो कस्तो देखिन्छ

यो प्रणाली लिनुहोस्

निःशुल्क साइन अप गर्नुहोस्, अनि कसरी लिने छान्नुहोस्। हरेक कागजात तपाईंको लाइब्रेरीमा, प्याकको नाम दिइएको फोल्डरमा जान्छ।

  • सशुल्क प्लानहरूमा समावेश

    आफ्नो प्लानका टेम्प्लेट क्रेडिट प्रयोग गर्नुहोस्। यसको मूल्य 20 हो।

    प्लान र मूल्य तुलना गर्नुहोस्
  • एकपटक किन्नुहोस्

    $999.90 एकपटक तिरेपछि सधैँ तपाईंकै। निःशुल्क प्लानमा पनि चल्छ।

साइन अप गर्न कार्ड चाहिँदैन। प्रारम्भिक पहुँच सदस्यहरूले जुनसुकै प्लानमा 30% छुट पाउँछन्।

यसले के समेट्छ

कामका 14 चरण

  1. Out-of-hours / night workManage worker fatigue and prevent unauthorised access.
  2. Working aloneUse the buddy system and communication protocols to support lone workers.
  3. Arrival on-site & assess onsite conditionsDeliver equipment safely and assess the site conditions.
  4. Work area set-upSet up an exclusion zone to prevent unauthorised access.
  5. Materials delivery by truckTake precautions for safe unloading and handling of materials.
  6. EnvironmentControl noise, vibration, air quality, waste and spills.
  7. House keepingKeep the work area clean to prevent slips, trips and falls.
  8. Working with powered & non-powered toolsUse tools safely, including pre-inspection and operation.
  9. Concrete floor preparationUse respiratory, eye and skin protection during floor levelling.
  10. Cutting & laying underlayFollow the guidelines to prevent cuts and lacerations.
  11. Laying floating floorCut planks safely and manage dust.
  12. Using adhesivesTake precautions when handling adhesives to prevent eye and skin irritation.
  13. On completionSecure the site and check electrical safety on completion.
  14. Emergency responsePrepare to respond to injury, fatality and environmental damage.

यसले समेट्ने खतराहरू

टेम्प्लेटहरू कसरी काम गर्छन्

यसलाई पैसा तिर्नुअघि नै चलाएर हेर्नुहोस्।

  1. निःशुल्क पूर्वावलोकन

    हरेक टेम्प्लेटका कामका चरण, खतरा र पहिलो काम पढ्न खुला छन्। साइन अप चाहिँदैन।

  2. एडिटर चलाएर हेर्नुहोस्

    कम्प्युटर वा फोनमा, डेमो SWMS लाई आफ्नो कम्पनी, काम र साइटअनुसार मिलाउनुहोस्।

  3. निःशुल्क साइन अप गर्नुहोस्

    तपाईंको विवरण र लोगो सर्छन्। यो टेम्प्लेट विवरण भरिएरै खुल्छ।

  4. क्रेडिट प्रयोग गर्नुहोस् वा एकपटक किन्नुहोस्

    सशुल्क प्लानहरूमा हरेक महिना टेम्प्लेट क्रेडिट आउँछ। वा सधैँका लागि यो एउटा किन्नुहोस्।