Precast Panel Information and Verification Log
Tilt-up and Precast Concrete Panel Checklist · FORM-31506
- Site address
- [Site address]
- Project Name/Description
- [Job name]
- Project manager
- —
- Project manager Mob. Ph
- —
- Project manager Email
- —
- Company Supervisor
- —
- Company Supervisor Mob. Ph
- —
- Company Supervisor Email
- —
- Certifying Engineer Company
- —
- Certifying Engineer Company ABN
- —
- Certifying Engineer Company Mob. Ph
- —
- Certifying Engineer Company Email
- —
- Certifying Engineer
- —
- Certifying Engineer Mob. Ph
- —
- Certifying Engineer Email
- —
- Panel Constructor
- —
- Panel Constructor ABN
- —
- Panel Constructor Mob. Ph
- —
- Panel Constructor Email
- —
- Panel Erector
- —
- Panel Erector ABN
- —
- Panel Erector Mob. Ph
- —
- Panel Erector Email
- —
Panel ID | Casting Date | Engineering Drawing # | Concrete Supplier | Concrete Spec | Concrete Slump | Concrete Test Result | Lifting Date | Remarks /Notes | Verifiers Name/Position | Initial/Date |
|---|---|---|---|---|---|---|---|---|---|---|
Tilt-up and precast concrete pour checklist
Concrete pour
Inspection criteria | Comments | Action required |
|---|---|---|
Concrete Sampling: | ||
Concrete Sampling: | ||
Concrete Check: | ||
Concrete Check: | ||
Concrete Check: | ||
Concrete Pour: | ||
Concrete Pour: | ||
Concrete Pour: | ||
Concrete Finish: | ||
Concrete Curing: |
Inspectors’ name | Signature | Date |
|---|---|---|
Tilt-up and precast concrete panel: pre-lift checklist
Section 1: Pre-erection checks
Inspection criteria | Comments | Action required |
|---|---|---|
Erection and Temporary Bracing: | ||
Deadman Design: | ||
Panel Layout and Erection Sequence: | ||
Concrete Panel Strength: | ||
Deadmen/Floor Slab Strength: | ||
Panel Identification: |
Section 2: Bracing and anchor requirements
Inspection criteria | Comments | Action required |
|---|---|---|
Brace Adherence and Strength: | ||
Brace Condition Suitability: | ||
Brace Identification Marking: | ||
Accurate Brace Quantity: | ||
Brace Installation: | ||
Anchor installation: | ||
Section 3: General hazards
Inspection criteria | Comments | Action required |
|---|---|---|
Section 4: First aid and emergency preparedness
Inspection criteria | Comments | Action required |
|---|---|---|
Inspectors’ name | Signature | Date |
|---|---|---|
Tilt-up and precast concrete panel: lift checklist
Section 1: Lift preparation
Inspection criteria | Comments | Action required |
|---|---|---|
Overhead Power Lines: | ||
Exclusion Zones: | ||
Exclusion Zone Height: | ||
Wind Conditions: |
Section 2: Crane operations
Inspection criteria | Comments | Action required |
|---|---|---|
Section 3: Rigging operations
Inspection criteria | Comments | Action required |
|---|---|---|
Section 4: Panel placement and alignment
Inspection criteria | Comments | Action required |
|---|---|---|
Inspectors’ name | Signature | Date |
|---|---|---|
Tilt-up and precast concrete panel: post-lift assessment checklist
Section 1: Panel integrity
Inspection criteria | Comments | Action required |
|---|---|---|
Section 2: Crane and rigging
Inspection criteria | Comments | Action required |
|---|---|---|
Section 3: Anchors and bracing
Inspection criteria | Comments | Action required |
|---|---|---|
Section 4: Panel installation
Inspection criteria | Comments | Action required |
|---|---|---|
Section 5: Safety
Inspection criteria | Comments | Action required |
|---|---|---|
Section 6: Documentation
Inspection criteria | Comments | Action required |
|---|---|---|
Inspectors’ name | Signature | Date |
|---|---|---|
यसको मार्गदर्शन र नमुना प्रविष्टिहरू लक गरिएका छन्
फारमको बनावट कस्तो छ तपाईं देख्न सक्नुहुन्छ। जुनसुकै डिभाइसमा भर्न, प्रिन्ट गर्न वा आफ्नो बनाउन यो लिनुहोस्।
Tilt-up and Precast Concrete Panel Checklist · FORM-31506
