प्रारम्भिक पहुँच अफर:प्रारम्भिक पहुँच: 30% छुट, सदस्यता रहेसम्म.

अफर लिनुहोस्

टेम्प्लेट कागजातहरू अंग्रेजीमा लेखिएका छन्।

किफायती प्याक · 38 टेम्प्लेट

Crane Hire Combo

किफायती प्याक · PACK-50522

Crane Hire Combo किफायती प्याक टेम्प्लेटको पूर्वावलोकन
  • 38 टेम्प्लेट
  • 22 को मूल्यमा 38
  • लाइब्रेरीको एउटै फोल्डरमा आउँछ

A set of eight SWMS, two SOPs, four plans and 24 forms for crane hire businesses and crane operators.

The SWMS cover mobile cranes, tower cranes, mini cranes, self-erecting cranes, truck-mounted cranes and dogging. The SOPs include Lock Out Tag Out - LOTO and Manual Handling. It also includes 28 plans and forms, such as Crane Lift Plan, Emergency Response Plan-Plant and Plant Safety Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 22 template credits instead of 38.

Crane Lift Plan को पूर्वावलोकन

Crane Lift Plan

व्यवस्थापन योजनाVersion 2

Site Details

Job #
—
Project Name
[Job name]
Site Location
[Site address]
Lift Location (on-site)
—
Subcontractor name
—
Subcontractor Ph
—
Crane Company
—
Crane Company Ph
—

थप 8 खण्ड

  1. Plan Approval
  2. Authorised Personnel
  3. Critical Lift Criteria
  4. Crane details
  5. Load Details
  6. र थप 3

पूरा लेखिएको, तपाईंको व्यवसायको विवरण थप्न तयार।

यसरी पूर्वावलोकन गर्नुहोस्

ब्राउजरमा यो कस्तो देखिन्छ

यो किफायती प्याक लिनुहोस्

निःशुल्क साइन अप गर्नुहोस्, अनि कसरी लिने छान्नुहोस्। हरेक कागजात तपाईंको लाइब्रेरीमा, प्याकको नाम दिइएको फोल्डरमा जान्छ।

  • सशुल्क प्लानहरूमा समावेश

    आफ्नो प्लानका टेम्प्लेट क्रेडिट प्रयोग गर्नुहोस्। यो प्याकको मूल्य 38 को सट्टा 22 हो।

    प्लान र मूल्य तुलना गर्नुहोस्
  • एकपटक किन्नुहोस्

    $1,978.90 $3,418.10 एकपटक तिरेपछि सधैँ तपाईंकै। निःशुल्क प्लानमा पनि चल्छ।

साइन अप गर्न कार्ड चाहिँदैन। प्रारम्भिक पहुँच सदस्यहरूले जुनसुकै प्लानमा 30% छुट पाउँछन्।

के के समावेश छ

  1. Crane Lift Plan

    व्यवस्थापन योजना · 9 खण्ड

    A Crane Lift Plan for planning each crane lift: critical lift criteria, crane, load and rigging details, safety requirements and a lift layout diagram.

    छुट्टै पनि किन्न पाइन्छ
  2. Workbox

    SWMS · कामका 13 चरण

    Workbox SWMS: 13 job steps for working at height in a workbox (man basket), from the rescue plan and trial lift to emergency response.

    छुट्टै पनि किन्न पाइन्छ
  3. JSEA Template

    फारम · 8 फिल्ड

    A Job Safety & Environmental Analysis (JSEA) form to complete before work starts on a new site or on arrival at the site each day.

    छुट्टै पनि किन्न पाइन्छ
  4. Emergency Response Plan-Plant

    व्यवस्थापन योजना · 18 खण्ड

    An emergency response plan for plant and machinery: emergency contacts, call procedure, crushing, cutting and entanglement responses, first aid and registers.

    छुट्टै पनि किन्न पाइन्छ
  5. Safe Work Method Statement (SWMS) Register

    फारम · 5 फिल्ड

    A register to record each Safe Work Method Statement by title, document number, issue and review dates, with management sign-off.

    छुट्टै पनि किन्न पाइन्छ
  6. Corrective and Preventative Actions Form

    फारम · 9 फिल्ड

    Record a corrective or preventative action: the issue and its seriousness, the evaluation, the action, who is responsible and the manager's sign-off.

    छुट्टै पनि किन्न पाइन्छ
  7. Plant Safety Management Plan

    व्यवस्थापन योजना · 22 खण्ड

    A plan for managing plant and equipment safety, from purchase and hire to maintenance, lock out tag out, machine guarding and disposal.

    छुट्टै पनि किन्न पाइन्छ
  8. Incident/Near Miss Reporting Form

    फारम · 7 फिल्ड

    An incident and near miss report form: reporter details, incident type and severity, witnesses, causes and the follow-up actions.

    छुट्टै पनि किन्न पाइन्छ
  9. Plant Maintenance Log

    फारम · 13 फिल्ड

    Log the maintenance of an item of plant: its make, model, serial number and location, then each maintenance date, the findings, work done, next due date and sign-off.

    छुट्टै पनि किन्न पाइन्छ
  10. Plant and Equipment Register

    फारम · 13 फिल्ड

    Record the maintenance requirements and history of all plant and equipment, and whether each item needs a licence to operate or registration with the regulator.

    छुट्टै पनि किन्न पाइन्छ
  11. Plant & Equipment Hazard Register

    फारम · 9 फिल्ड

    Record the hazards and controls for every task that involves plant and equipment used by the company.

    छुट्टै पनि किन्न पाइन्छ
  12. Plant Risk Assessment Form

    फारम · 25 फिल्ड

    Identify the hazards of an item of plant, score the risk with a risk matrix, and tick the control measures in place, with reviews and approval.

    छुट्टै पनि किन्न पाइन्छ
  13. Lock Out Tag Out - LOTO

    SOP · 9 खण्ड

    Lock out tag out (LOTO) procedure: isolate every energy source before maintenance, restore equipment to service, and assess the risks of the work.

    छुट्टै पनि किन्न पाइन्छ
  14. Purchasing Record Form

    फारम · 4 फिल्ड

    A purchasing record and OHS checklist to help manage the risks of new equipment, chemicals and other items before they are introduced.

    छुट्टै पनि किन्न पाइन्छ
  15. Plant-Equipment Prestart Checklist

    फारम · 4 फिल्ड

    A Yes/No/N/A prestart checklist for plant and equipment: inspection, electrical, guarding, training, safety equipment and emergency checks.

    छुट्टै पनि किन्न पाइन्छ
  16. Management Review Meeting Report

    फारम · 7 फिल्ड

    A form to record a management review meeting: attendance, discussion, previous action items and new actions.

    छुट्टै पनि किन्न पाइन्छ
  17. Commissioning Checklist for Plant

    फारम · 4 फिल्ड

    A commissioning checklist for newly installed plant: 15 Yes, No or N/A inspection questions, notes and actions, and a technician or engineer sign-off.

    छुट्टै पनि किन्न पाइन्छ
  18. Isolation Permit to Work

    फारम · 13 फिल्ड

    A permit for the safe isolation of plant and equipment during maintenance, cleaning or repairs, with sign-offs and priority release.

    छुट्टै पनि किन्न पाइन्छ
  19. Pre-Purchase Safety Checklist for Plant

    फारम · 5 फिल्ड

    A checklist for the purchase, hire, lease or donation of plant: consultation, supplier, safety, PPE, training, maintenance and cost.

    छुट्टै पनि किन्न पाइन्छ
  20. Mobile Plant Pre-Start Checklist

    फारम · 3 फिल्ड

    A pre-start checklist for mobile plant: Yes, No or N/A checks on tyres, lights, fluids, cabin and safety devices, with comments for each section.

    छुट्टै पनि किन्न पाइन्छ
  21. Standard Operating Procedure (SOP) Register

    फारम · 6 फिल्ड

    Register to keep track of the SOPs in your workplace, with the task, issue and review dates, version and responsible person.

    छुट्टै पनि किन्न पाइन्छ
  22. Worker Consultation Record

    फारम · 9 फिल्ड

    A worker consultation record: purpose, participants, key points, feedback and concerns, agreed actions and signatures.

    छुट्टै पनि किन्न पाइन्छ
  23. SOP Template

    फारम · 9 फिल्ड

    A Standard/Safe Operating Procedure (SOP) template for writing step-by-step procedures specific to your business tasks.

    छुट्टै पनि किन्न पाइन्छ
  24. Machine Guarding Checklist

    फारम · 11 फिल्ड

    A machine guarding inspection checklist covering guard installation, condition and functioning, signage and controls, and administrative controls.

    छुट्टै पनि किन्न पाइन्छ
  25. Worker Training Record

    फारम · 10 फिल्ड

    A record of one worker's training in one course: who approved it, start and completion dates, description, expected outcomes and training type.

    छुट्टै पनि किन्न पाइन्छ
  26. Internal Audit Plan

    व्यवस्थापन योजना · 5 खण्ड

    An Internal Audit Plan to set the audit's subject, scope, objectives, team and criteria, so audits are conducted efficiently and effectively.

    छुट्टै पनि किन्न पाइन्छ
  27. SWMS Template

    फारम · कामका 1 चरण

    SWMS Template: ready to fill in, with your business's details on every copy. Part of the Health and Safety Manual.

    छुट्टै पनि किन्न पाइन्छ
  28. Internal Audit Report

    फारम · 11 फिल्ड

    Helps auditors give management clear, objective and impartial information about what is going well and what needs to be improved.

    छुट्टै पनि किन्न पाइन्छ
  29. Machine Guarding Risk Assessment Form

    फारम · 22 फिल्ड

    Assess the physical hazards of machinery and machine guarding, rate the risk with a risk matrix, and record the controls and who is responsible.

    छुट्टै पनि किन्न पाइन्छ
  30. Worker Training and Induction Register

    फारम · 10 फिल्ड

    A register of the training and competencies each worker has completed, their licences and expiry dates, and whether they have been correctly inducted.

    छुट्टै पनि किन्न पाइन्छ
  31. Tower Crane

    SWMS · कामका 13 चरण

    SWMS for tower crane work: planning, work area set-up, climbing the tower, pre-start checks, crane operation, re-fuelling and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  32. Dogman

    SWMS · कामका 12 चरण

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    छुट्टै पनि किन्न पाइन्छ
  33. Lock Out Tag Out (LOTO)

    SWMS · कामका 12 चरण

    SWMS for lock out tag out of plant and equipment: isolation procedures, permits, locks and tags, electrical isolation and returning plant to service.

    छुट्टै पनि किन्न पाइन्छ
  34. Mini Crane

    SWMS · कामका 16 चरण

    Mini Crane SWMS: 16 job steps from planning and set-up to crane placement near power lines, load equipment, lifting, maintenance and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  35. Mobile Crane

    SWMS · कामका 16 चरण

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  36. Crane Self-Erecting

    SWMS · कामका 19 चरण

    Crane Self-Erecting SWMS: 19 job steps from lift planning and erecting the crane to workboxes, re-fuelling and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  37. Crane Truck Mounted

    SWMS · कामका 16 चरण

    SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  38. Manual Handling

    SOP · 5 खण्ड

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    छुट्टै पनि किन्न पाइन्छ

यसले के समेट्छ

यसले समेट्ने खतराहरू

यसले सन्दर्भ गर्ने कानुन र मापदण्डहरू

हरेक SWMS सँग हाम्रो कानुन र अभ्यास संहिताको सन्दर्भ सूची आउँछ।

तपाईंले कति बचत गर्नुहुन्छ

टेम्प्लेटकामका चरणछुट्टै
Crane Lift Plan0$89.95 · 1 क्रेडिट
Workbox13$89.95 · 1 क्रेडिट
JSEA Template0$89.95 · 1 क्रेडिट
Emergency Response Plan-Plant0$89.95 · 1 क्रेडिट
Safe Work Method Statement (SWMS) Register0$89.95 · 1 क्रेडिट
Corrective and Preventative Actions Form0$89.95 · 1 क्रेडिट
Plant Safety Management Plan0$89.95 · 1 क्रेडिट
Incident/Near Miss Reporting Form0$89.95 · 1 क्रेडिट
Plant Maintenance Log0$89.95 · 1 क्रेडिट
Plant and Equipment Register0$89.95 · 1 क्रेडिट
Plant & Equipment Hazard Register0$89.95 · 1 क्रेडिट
Plant Risk Assessment Form0$89.95 · 1 क्रेडिट
Lock Out Tag Out - LOTO0$89.95 · 1 क्रेडिट
Purchasing Record Form0$89.95 · 1 क्रेडिट
Plant-Equipment Prestart Checklist0$89.95 · 1 क्रेडिट
Management Review Meeting Report0$89.95 · 1 क्रेडिट
Commissioning Checklist for Plant0$89.95 · 1 क्रेडिट
Isolation Permit to Work0$89.95 · 1 क्रेडिट
Pre-Purchase Safety Checklist for Plant0$89.95 · 1 क्रेडिट
Mobile Plant Pre-Start Checklist0$89.95 · 1 क्रेडिट
Standard Operating Procedure (SOP) Register0$89.95 · 1 क्रेडिट
Worker Consultation Record0$89.95 · 1 क्रेडिट
SOP Template0$89.95 · 1 क्रेडिट
Machine Guarding Checklist0$89.95 · 1 क्रेडिट
Worker Training Record0$89.95 · 1 क्रेडिट
Internal Audit Plan0$89.95 · 1 क्रेडिट
SWMS Template1$89.95 · 1 क्रेडिट
Internal Audit Report0$89.95 · 1 क्रेडिट
Machine Guarding Risk Assessment Form0$89.95 · 1 क्रेडिट
Worker Training and Induction Register0$89.95 · 1 क्रेडिट
Tower Crane13$89.95 · 1 क्रेडिट
Dogman12$89.95 · 1 क्रेडिट
Lock Out Tag Out (LOTO)12$89.95 · 1 क्रेडिट
Mini Crane16$89.95 · 1 क्रेडिट
Mobile Crane16$89.95 · 1 क्रेडिट
Crane Self-Erecting19$89.95 · 1 क्रेडिट
Crane Truck Mounted16$89.95 · 1 क्रेडिट
Manual Handling0$89.95 · 1 क्रेडिट
एक एक गरी किन्दा$3,418.10 · 38 क्रेडिट
यो प्याकमा$1,978.90 · 22 क्रेडिट तपाईं $1,439.20 बचत गर्नुहुन्छ

समीक्षाहरू

अहिलेसम्म कुनै समीक्षा छैन।

टेम्प्लेटहरू कसरी काम गर्छन्

यसलाई पैसा तिर्नुअघि नै चलाएर हेर्नुहोस्।

  1. निःशुल्क पूर्वावलोकन

    हरेक टेम्प्लेटका कामका चरण, खतरा र पहिलो काम पढ्न खुला छन्। साइन अप चाहिँदैन।

  2. एडिटर चलाएर हेर्नुहोस्

    कम्प्युटर वा फोनमा, डेमो SWMS लाई आफ्नो कम्पनी, काम र साइटअनुसार मिलाउनुहोस्।

  3. निःशुल्क साइन अप गर्नुहोस्

    तपाईंको विवरण र लोगो सर्छन्। यो टेम्प्लेट विवरण भरिएरै खुल्छ।

  4. क्रेडिट प्रयोग गर्नुहोस् वा एकपटक किन्नुहोस्

    सशुल्क प्लानहरूमा हरेक महिना टेम्प्लेट क्रेडिट आउँछ। वा सधैँका लागि यो एउटा किन्नुहोस्।