A set of ten SWMS, 11 SOPs, one plan and one form for contractors who install culverts and tanks.
The SWMS cover culvert and tank installation, trench excavation, concrete placement, concrete pumping, traffic corridors and dogging. The SOPs include Front-end Loader, Plant Attachment Maintenance and Backhoe Loader. It also includes Excavation Collapse Emergency Response Plan and Excavation Safety Inspection Checklist.
Each document is the same one sold on its own, so you get every update to it. Together they cost 18 template credits instead of 23.