A set of 12 SWMS, five SOPs and one plan for tree arborists and tree care contractors.

The SWMS cover manual and mechanical tree felling, tree trimming, wood chippers, stump grinders and traffic corridors. The SOPs include Chain Saw, Extension Ladder and Handheld Power Tools. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 14 template credits instead of 18.

Height Access Equipment SWMS को पूर्वावलोकन

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

कामका थप 16 चरण, Work area set-up देखि Emergency response सम्म

हरेकमा खतरा, जोखिम रेटिङ र नियन्त्रण, साथै तपाईंको टोलीको साइन-अन।

यसरी पूर्वावलोकन गर्नुहोस्

ब्राउजरमा यो कस्तो देखिन्छ

यो किफायती प्याक लिनुहोस्

निःशुल्क साइन अप गर्नुहोस्, अनि कसरी लिने छान्नुहोस्। हरेक कागजात तपाईंको लाइब्रेरीमा, प्याकको नाम दिइएको फोल्डरमा जान्छ।

  • सशुल्क प्लानहरूमा समावेश

    आफ्नो प्लानका टेम्प्लेट क्रेडिट प्रयोग गर्नुहोस्। यो प्याकको मूल्य 18 को सट्टा 14 हो।

    प्लान र मूल्य तुलना गर्नुहोस्
  • एकपटक किन्नुहोस्

    $1,259.30 $1,619.10 एकपटक तिरेपछि सधैँ तपाईंकै। निःशुल्क प्लानमा पनि चल्छ।

साइन अप गर्न कार्ड चाहिँदैन। प्रारम्भिक पहुँच सदस्यहरूले जुनसुकै प्लानमा 30% छुट पाउँछन्।

के के समावेश छ

  1. Height Access Equipment

    SWMS · कामका 17 चरण

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    छुट्टै पनि किन्न पाइन्छ
  2. Extension Ladder

    SOP · 7 खण्ड

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    छुट्टै पनि किन्न पाइन्छ
  3. Falls Emergency Rescue Plan

    व्यवस्थापन योजना · 14 खण्ड

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    छुट्टै पनि किन्न पाइन्छ
  4. Handheld Power Tools

    SOP · 9 खण्ड

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    छुट्टै पनि किन्न पाइन्छ
  5. Spotter

    SWMS · कामका 11 चरण

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    छुट्टै पनि किन्न पाइन्छ
  6. Chain Saw

    SOP · 9 खण्ड

    Safe operating procedure for a chain saw: hazards, PPE, training, pre-operational inspection, operation, maintenance, first aid and a hazard checklist.

    छुट्टै पनि किन्न पाइन्छ
  7. Tree Felling - Manual

    SWMS · कामका 15 चरण

    SWMS for manual tree felling: training, power line permits, traffic, chainsaw use, cross-cutting, moving felled trees, fuelling and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  8. Tipper and Dog

    SWMS · कामका 16 चरण

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    छुट्टै पनि किन्न पाइन्छ
  9. Manual Handling

    SOP · 5 खण्ड

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    छुट्टै पनि किन्न पाइन्छ
  10. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · कामका 8 चरण

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    छुट्टै पनि किन्न पाइन्छ
  11. Bites and Stings Prevention and Treatment

    SWMS · कामका 9 चरण

    Bites and Stings SWMS: nine job steps covering snake, spider, bee, wasp, tick and mosquito bite prevention, first aid and emergency response outdoors.

    छुट्टै पनि किन्न पाइन्छ
  12. Tree Trimming EWP-Rope Work

    SWMS · कामका 16 चरण

    SWMS for roadside tree trimming from an elevated work platform or on rope: power lines, ropework, traffic, fuelling and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  13. Hand Tools

    SOP · 9 खण्ड

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    छुट्टै पनि किन्न पाइन्छ
  14. Powered Non-powered Tools

    SWMS · कामका 12 चरण

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    छुट्टै पनि किन्न पाइन्छ
  15. Wood Chipper

    SWMS · कामका 14 चरण

    Wood Chipper SWMS: fourteen job steps covering delivery, set-up, operation, refuelling and emergency response for roadside wood chipping.

    छुट्टै पनि किन्न पाइन्छ
  16. Manual Handling

    SWMS · कामका 18 चरण

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    छुट्टै पनि किन्न पाइन्छ
  17. Tree Felling Mechanical

    SWMS · कामका 16 चरण

    SWMS for mechanical tree felling with earthmoving equipment, covering 16 job steps from planning and site set-up to tree pushing and emergencies.

    छुट्टै पनि किन्न पाइन्छ
  18. Stump Grinder

    SWMS · कामका 14 चरण

    SWMS for stump grinder work: delivery and coupling, traffic, set-up, operation, refuelling and emergency response.

    छुट्टै पनि किन्न पाइन्छ

यसले के समेट्छ

यसले समेट्ने खतराहरू

यसले सन्दर्भ गर्ने कानुन र मापदण्डहरू

हरेक SWMS सँग हाम्रो कानुन र अभ्यास संहिताको सन्दर्भ सूची आउँछ।

तपाईंले कति बचत गर्नुहुन्छ

टेम्प्लेटकामका चरणछुट्टै
Height Access Equipment17$89.95 · 1 क्रेडिट
Extension Ladder0$89.95 · 1 क्रेडिट
Falls Emergency Rescue Plan0$89.95 · 1 क्रेडिट
Handheld Power Tools0$89.95 · 1 क्रेडिट
Spotter11$89.95 · 1 क्रेडिट
Chain Saw0$89.95 · 1 क्रेडिट
Tree Felling - Manual15$89.95 · 1 क्रेडिट
Tipper and Dog16$89.95 · 1 क्रेडिट
Manual Handling0$89.95 · 1 क्रेडिट
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 क्रेडिट
Bites and Stings Prevention and Treatment9$89.95 · 1 क्रेडिट
Tree Trimming EWP-Rope Work16$89.95 · 1 क्रेडिट
Hand Tools0$89.95 · 1 क्रेडिट
Powered Non-powered Tools12$89.95 · 1 क्रेडिट
Wood Chipper14$89.95 · 1 क्रेडिट
Manual Handling18$89.95 · 1 क्रेडिट
Tree Felling Mechanical16$89.95 · 1 क्रेडिट
Stump Grinder14$89.95 · 1 क्रेडिट
एक एक गरी किन्दा$1,619.10 · 18 क्रेडिट
यो प्याकमा$1,259.30 · 14 क्रेडिट तपाईं $359.80 बचत गर्नुहुन्छ

समीक्षाहरू

अहिलेसम्म कुनै समीक्षा छैन।

टेम्प्लेटहरू कसरी काम गर्छन्

यसलाई पैसा तिर्नुअघि नै चलाएर हेर्नुहोस्।

  1. निःशुल्क पूर्वावलोकन

    हरेक टेम्प्लेटका कामका चरण, खतरा र पहिलो काम पढ्न खुला छन्। साइन अप चाहिँदैन।

  2. एडिटर चलाएर हेर्नुहोस्

    कम्प्युटर वा फोनमा, डेमो SWMS लाई आफ्नो कम्पनी, काम र साइटअनुसार मिलाउनुहोस्।

  3. निःशुल्क साइन अप गर्नुहोस्

    तपाईंको विवरण र लोगो सर्छन्। यो टेम्प्लेट विवरण भरिएरै खुल्छ।

  4. क्रेडिट प्रयोग गर्नुहोस् वा एकपटक किन्नुहोस्

    सशुल्क प्लानहरूमा हरेक महिना टेम्प्लेट क्रेडिट आउँछ। वा सधैँका लागि यो एउटा किन्नुहोस्।