Asbestos Transport - Disposal

SWMS · SWMS-10436

  • 8 bước công việc
  • Phiên bản 4

This Asbestos Transport - Disposal Safe Work Method Statement (SWMS) guides businesses in safely transporting and disposing of asbestos-containing materials (ACM). It outlines the precautions needed to reduce risks to people and the environment.

It covers 8 job steps: planning, training, arrival on-site and assessing site conditions, ACM loading and unloading, travel to, from and between sites, the environment, completion, and emergency response.

It includes controls for high-risk construction work involving mobile plant movement and asbestos disturbance, and for environmental impacts such as noise, air quality, waste, waterways and soils.

It suits licensed asbestos removal contractors, waste management companies, site supervisors and managers, environmental and safety officers, and construction and demolition companies.

Xem trang riêng

Xem trước SWMS Asbestos Transport - Disposal

Asbestos Transport - Disposal

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas Mains
  • Hazardous Lines
  • Energised Electrical

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Disposable Respirator
  • Hand Protection
  • Protective Clothing

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Asbestos contamination

      Before controls3 High
      Controls
      • Removal of friable ACM only be undertaken by a licensed asbestos removalist

      • Waste only be removed to a site licensed to accept waste asbestos

      • people intending to dispose of waste asbestos must contact the disposal site operator to check whether the site is appropriately licensed to accept the waste.

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Vehicle failure

      Before controls3 High
      Controls
      • Vehicle must be registered with the State Road and Traffic Authorities before use.

      • Inspect the vehicle, as per manufacturers’ instructions, before use

      • Do not use if any fault/damage/missing parts. Report immediately and follow LOTO procedures.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 7 bước công việc, từ Training đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy hệ thống này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Mọi tài liệu sẽ vào Thư viện của bạn, trong một thư mục mang tên gói.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 20 lượt.

    So sánh các gói và giá
  • Mua một lần

    $999.90 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

8 bước công việc

  1. PlanningIdentify the asbestos, plan the transport route and have the necessary equipment ready
  2. TrainingMake sure all personnel are trained in handling and safety measures
  3. Arrival on-site & assess onsite conditionsAssess the site conditions to identify potential hazards
  4. ACM loading & unloadingLoad and unload the asbestos materials safely
  5. Travel to, from & between sitesFollow the safety measures for transporting the asbestos materials
  6. EnvironmentMinimise the environmental impact of asbestos transport
  7. On completionFinalise the transport, dispose of the waste safely and leave the site clean
  8. Emergency responseApply the control measures for incidents during asbestos transport

Các mối nguy được đề cập

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.