Power Pole Temporary Support

SWMS · SWMS-10450

Xem trước mẫu SWMS Power Pole Temporary Support
  • 13 bước công việc
  • Phiên bản 3
  • Crane & Lifting Equipment
  • Đọc được trên mọi điện thoại

This Power Pole Temporary Support Safe Work Method Statement (SWMS) covers hazards and controls associated with supporting a power pole using a crane in the presence of overhead power lines and in close proximity to roads with public vehicular traffic.

It covers 13 job steps, from training and planning through work area set-up, equipment inspection and pole support to completion and emergency response.

It covers High-Risk Construction Work (HRCW) controls for mobile plant movement, gas mains and hazardous lines, energised electrical services, and work carried out adjacent to a road. Additional controls are included for slips, trips and falls, hazardous manual tasks, outdoor work and environmental considerations.

Xem trước SWMS Power Pole Temporary Support

Power Pole Temporary Support

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Standards

  • Standards Australia 2019, – Manual of uniform traffic control devices - Traffic control for works on roads, AS 1742.3:2019

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Personal injury, property damage &/or environmental incident.

      Examples given are to be removed if necessary, before using this SWMS. Replace with licences applicable to the task in your state or territory

      Before controls3 High
      Controls
      • All operators have the appropriate Heavy Vehicle licence road operation

      • The operator holds a valid certificate to operate a Crane – e.g. C2 for Crane with a capacity up to 20 tonnes; C6 up to 60 tonnes; C1 up to 100 tonnes, and CO greater than 100 tonnes

        • Operation: High-Risk Work Licence

        • E.g. Crane: Slewing Mobile Crane—with a capacity of up to 60 tonnes

        • E.g. Dogman: Dogging

        • E.g. Rigger: Basic rigging; Intermediate rigging; Advanced rigging

      • Operators are provided with information, training and instruction on the hazards, risks and control measures relevant to the workplace.

      • Vehicle must be registered with the State Road and Traffic Authorities before use

      • Plant registration in place.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

Thêm 12 bước công việc, từ Planning đến Emergency response

Mỗi bước đều có mối nguy, mức rủi ro và biện pháp kiểm soát, cùng phần ký nhận của đội.

Xem trước dạng

Hiển thị thế nào trên trình duyệt

Lấy mẫu này

Đăng ký miễn phí, rồi chọn cách bạn muốn lấy. Thông tin công ty của bạn sẽ được điền sẵn.

  • Có trong các gói trả phí

    Dùng lượt mở mẫu trong gói dịch vụ của bạn. Mẫu này cần 1 lượt.

    So sánh các gói và giá
  • Mua một lần

    $89.95 trả một lần, và mẫu là của bạn mãi mãi. Dùng được cả với gói Miễn phí.

Không cần thẻ để đăng ký. Thành viên truy cập sớm được giảm 30% cho mọi gói.

Nội dung bao gồm

13 bước công việc

  1. TrainingCheck operators hold the licences and training the work needs
  2. PlanningPlan the crew and the work near electric lines
  3. Arrival on-site & assess onsite conditionsArrive on site and assess the site conditions
  4. Check weather conditions & prepareCheck the weather and prepare for hot or cold conditions
  5. Work area set-upSet up the work area and exclusion zones
  6. EnvironmentManage environmental impacts
  7. House keepingKeep the work area clean and clear of trip hazards
  8. Manual tasksManage the manual tasks safely
  9. Select & inspect equipmentSelect and inspect the crane and lifting gear
  10. Pre-operational assessmentAssess the pole and the wind before operating
  11. Pole supportOperate the crane and support the pole
  12. On completionPack up and leave the site safe
  13. Emergency responseRespond to an emergency

Các mối nguy được đề cập

Luật và tiêu chuẩn được dẫn chiếu

Mỗi SWMS đều đi kèm danh sách tham chiếu luật và bộ quy tắc thực hành (codes of practice) của chúng tôi.

Đánh giá

Chưa có đánh giá nào.

Xem tất cả

Cách các mẫu hoạt động

Dùng thử trước khi trả tiền.

  1. Xem trước miễn phí

    Các bước công việc, mối nguy và nhiệm vụ đầu tiên của mọi mẫu đều mở để đọc. Không cần đăng ký.

  2. Thử trình soạn thảo

    Chỉnh một SWMS demo theo công ty, công việc và công trường của bạn, trên máy tính hoặc điện thoại.

  3. Đăng ký miễn phí

    Thông tin và logo của bạn được chuyển sang. Mẫu này sẽ mở ra với thông tin đã điền sẵn.

  4. Dùng một lượt hoặc mua một lần

    Các gói trả phí có lượt mở mẫu mỗi tháng. Hoặc mua mẫu này để giữ lại.